Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • CLC number and address
  • Start Works Notice Received?

  • Date and time

  • Soil conditions as per soil report?

  • Stage of works achieved at time of inspection

  • Footings located as per plan?

  • Surface water drainage in place and directed away from footings?

  • Footing excavations as per certified plan?

  • Steel types as per certified drawing?

  • Steel placement as per certified drawings?

  • Is a Form 44 required to be issued?

  • Add photo

  • Person undertaking inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.