PMC AUDIT SCORING SYSTEM
PMC HSE POLICY
-
Is Dar PMC HSE Policy communicated to all personnel at the project, through different communication channels
PMC HSE MANUALS
-
Is the PMC H&S Manual and the PMC Environmental Manual delivered to all personnel, by trainings and other communication channels
PMC INDUCTION TRAINING
-
Has the PMC HSE Induction training for Dar project employees been delivered recorded and maintained
PMC HSE OBJECTIVES
-
Are the objectives been discussed at the internal meetings and records kept
PMC PROJECT ORGANISATION CHART
-
Is the organization chart established, with all Dar site personnel which identifyies communication channels
PMC LEGAL REGISTER
-
Are all legal and other HSE requirements identified, kept up-to-date and communicated to persons working under their controls and any relevant interested parties.
PMC TRAINING
-
Is the training matrix for Dar personnel established, and records kept
PMC HSE NOTICE BOARD
-
Is the HSE Notice Board displayed at the workplace, with all the HSE relevant information required
PMC EMERGENCY PROCEDURES
-
Is there an Emergency Procedure established for the project?
-
Is the Risk Register kept up to date and implemented properly
-
Have emergency drills been conducted frequently?
-
Fire Safety - Fire Risk Assessment - completed and communicated
-
First Aid - Provisions, First Aiders
-
Has the Contractor submitted the necessary Lifting Plans for approval prior any lifting operations on sites
-
Is sufficient HSE Signage displayed on the Project
ARRANGEMENTS
-
Has the Contractors HSE Plan been submitted and reviewed by Dar HSE team
-
Have the Method Statements & Risk Assessments been submitted and reviewed by Dar HSE team
-
Does the Contractor have a competent HSE Team
-
Electrical Safety - Inspection, etc...
-
Welfare Facilities
-
Is PPE available and recorded as issue
-
Are Project Registers Complete including;<br>- Tool Box Talks.<br>- Contractor HSE inspection.<br>- Permits completed
-
COSHH Assessments - Register, Storage
PMC HSE INSPECTIONS
-
Are all HSE reports completed and recorded transmittal to the contractor with evidence of closure on issues raised
NON-COMPLIANCE (NCR)
-
Is the NCR Register been up to date and records kept
CORRECTIVE ACTION PLANS
-
Is the corrective action plan established and recorded for each audit report
ACCIDENTS, INCIDENTS, NEAR MISS
-
Are the reports been reported to the responsible parties and records kept. Are investigation reports recorded and corrective actions issued to prevent reoccurrence
PMC KPI WORKBOOK
-
Is the KPI workbook being submitted to the Dar PMC HSE - Amman, is it being accurately recorded and maintained
HSE MEETINGS, CONSULTATION
-
Is a HSE Meeting being conducted and minuted periodically to discuss the HSE Concerns on the Project
Environmental
-
Is there a site waste management plan established
-
Is waste segregated and reused where applicable?
-
Are drip trays provided for static plant?
-
Have environmental impact assessment been completed?
-
Are spill kit readily available?
Additional comments
-
Additional comments
End
-
Auditor Signature
-
Representative signature
AUDIT MEETING
Audit Meeting
-
Regional Office:
-
Select date
-
Audited By:
-
Project Manager:
-
Project Name:
Aspected Audited
-
Office Safety
-
Office Environmental
-
Project Safety
-
Project Environmental
Summery of Findings/ Conclusion:
-
Summery of Findings/ Conclusion:
-
HSE Manager Signature:
-
Project Managers Signature:
-
Auditor Signature: