Title Page
-
Conducted on
-
Prepared by
COMPANY DETAILS
-
Full company details and registration number
undefined
-
-
Insurance details
-
Letter of Good Standing
-
Safety, Health and Environmental Policy (Legal Requirements)
-
Policy for treating / managing IOD's and rehabilitation
-
Drug and Alcohol Substance policy
-
Scope of Work
-
37(2) Mandatory Agreement
-
PPE Policy
-
List of all sub contractors and proof of registration with workman's compensation
-
Tax Registration from (SARS) - Tax Clearance Certificate
-
Notification of Construction Work
PEOPLE
-
Inventory of all personnel and their occupations
-
Organogram
-
Personal particulars of all persons
-
Medical examinations records
-
Site Specific Induction Records
-
Bidvest Induction Records
-
Site Safety Rules
-
Job descriptions (role and responsibilities0
-
Personnel File (Include CV, ID, License and competency certificates)
-
All Legal appointments - attached proof of competency
-
Section 16(2) Person to ensure compliance with OHS Act on site
-
CR 5(1)(h) Principal Contractor
-
CR 8 (7) Construction Supervisor
-
CR 8 (8) Assistant Construction Supervisor
-
CR 8 (5) Site Safety Officer
-
CR 9 (1) Risk Assessor
-
GAR 9(2) Incident Investigator
-
CR 10(1) Fall Protection Planner
-
GSR 3(4) First Aider
-
GAR 7 SHE Representatives
-
GSR 13A Ladder Inspector
-
Portable Electrical Tool Inspector
-
Demolition work Supervisor
-
Tool Inspector
-
Excavation Supervisor
-
Stacking and Storage Supervisor
-
Temporary Electrical Installation Inspector Appointment Letter (Installation Electrician)
-
Scaffolding Work Supervisor
-
CR 16(1) Scaffold Erector
-
CR 16(1) Scaffold Team Leader
-
CR 16 (1) Scaffold Inspectors
-
Lifting Machine and Equipment Inspector
-
Explosive and Blasting Supervisor
-
Piling Supervisor
-
Formwork and Support Work Supervisor
REGISTERS AND INSPECTION RECORDS
-
Inventory of all tools, equipment and vehicles
-
Tools, equipment and vehicles certificates/licenses/registration and control
-
Checklists for each type of tools and equipment
-
SHE Representative Inspections
-
Checklist and Registers
-
Contents of First Aid Box Inspection Registers (OHS Act GSR 3 & Annexure 1)
-
Portable Electric Tools Inspection registers
-
Hand Tools Inspection Registers
-
Ladder Inspection Registers
-
Fall Arrest and Rope Access Inspection Reports
-
Plant & Machinery Inspection Registers
-
Personal Protective Equipment and Safety wear Issue and Inspection registers as indicated on the risk assessment
-
Gas testing results (Pre - & during process)
-
Site Visitors Register
-
Site daily diary
-
Scaffolding Inspection Registers
-
Lifting Machine and Lifting Tackle Monthly Inspection Registers
-
Lifting Machine and Lifting Tackle Load Testing Certificates
-
Excavations inspections
-
Form Work and Support Work inspections Records
-
Blasting Preparations and Explosives storages facilities inspections records
-
Pressure equipment Inspection Registers (Monthly and every three years)
-
Fire extinguishers must be inspected annually (Labelled)
-
Certificate of compliance
-
Anchors Certificate of compliance
-
Scaffolding Certificate of compliance (Scaffolding Tag)
-
Temporary electrical installation inspection register
-
Permanent Electrical installation inspection register
INTERNAL COMMUNICATION
-
Safety & Toolbox Talks (Contents and attendance registers)
-
Start Up & Operational Meeting Minutes
-
SHE Meetings register
-
SHE Plan and File Review
EXTERNAL COMMUNICATION
-
Project Site Meeting Minutes
-
Contractors Meeting Minutes
-
Customer Interaction Meetings
ENVIRONMENT
-
Environmental Management Plan
-
Waste Management Plan
-
Waste Disposal (Bidvest FO-1355 Waste Register)
CHEMICALS / MATERIALS
-
Inventory of all chemicals
-
Copies of all safety data sheets
-
Hazardous chemical control program
-
MSDS Training
-
Hazardous waste disposal certificates
WORK
-
Risk assessment based on work program (HIRA)(Activity based risk assesments)
-
Baseline Risk assessments
-
Risk assessment training on working on heights
-
Site specific SHE Requirements (Client Specifications)
-
Method Statements
-
Emergency procedure
-
Rescue Plan (Working at heights and excavations)
-
Emergency contact details
-
Approved Safety Plan
-
Fall Protection Plan
-
Quality Control Plan
-
Traffic Plan
PERMIT TO WORK
-
Electrical Distribution and switch over Permits
-
Shutdown off the main water supply [WAP]
-
Hot work e.g. welding; cutting; grinding, etc.as per risk assessment
-
Core Drilling
-
Working in Confined Spaces, where the risk of gas inhalation exists
-
Working with Asbestos - Approval from the Department of Labour
-
Access to site permit
undefined
OPERATING / SAFE WORKING PROCEDURES
-
Risk Management Procedure (Process, Schedule, Review plan, Team members)
-
Confined Space Procedure
-
Lock out Procedure
-
Demolition Work Method Statement (CR 12)
-
Excavation Safe Working Procedures
-
Stacking and Storages Method Statement
-
Communication Plan
-
Public Protection Method Statement
-
Asbestos work Method Statement
-
Explosives and Blasting Method Statement
-
Pilling Method Statement and Procedure
-
Explosive Powered Tools and Cartridge Safe Working Procedure
-
Bidvest-MN-1049 Bidvest Waste Management Manual
-
Safety Signage (Job related warning signs)
-
Demarcate all stacking and storage areas
-
Night Work: Written approval from the client
-
Client approval for the use of toilet or shower facilities
-
Explosives and Blasting Permit from the Department of Labour
-
Piling approved by a Civil Engineer
-
Formwork and Support Work approved by a Civil Engineer
-
Explosive Powered Tools and Cartridge Control Sheets
INCIDENT / ACCIDENTS
-
Injury on Duty Policy
-
Monthly and Weekly Stats Submission
-
SHE Synopsis
-
Accident / Investigation Forms
-
Accident / Incident Registers
-
Environmental Incident Report
-
Incident Analysis and Near Miss Report
AUDITS CONTRACTOR
-
SHE Plan and File Audit (Before work commence)
-
Site SHEQ Inspection Reports
-
Planned Task Observations Reports
-
Quality Control Inspections Reports
-
Construction Regulation SHE Audit Reports (Minimum Monthly)
-
Demolition Work Surveys and Inspection Reports
-
Excavation related Inspection Reports
-
Hazardous Chemicals Substances and Flammable Liquids Storage Areas Inspection Records
-
Formwork and Support Work Inspection and Test Results Records
AUDITS CUSTOMER
-
SHE Plan and File Audit (Before work commence)
-
Site SHEQ Inspection Reports
-
Construction Regulation SHE Audit Reports (Minimum Monthly)
-
Quality Control Inspections Reports
WELFARE FACILITIES
-
Provide temporary toilet facilities for staff
-
Approval from client to use toilet facilities
-
Provide water for human consumption