Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • This method statement template can be used for most if not all construction based activities. If a section does not apply to your task then simply put a N/A in the answer box.

Section 1 - Validity

  • Version Number

  • Changes from last version

  • Intended start date and time

  • Intended finish date and time

  • OR

  • Till further notice?

Section 2 - Hazards

  • Risk assessment(s) reference(s)

  • Known hazards

Section 3 - Access

  • Where exactly, on site, the work will be conducted

  • Photos of specific work area or annotated drawings

  • Access equipment required

  • Specialist items required

Section 4 - Work Details

  • Step by step detail of how work will be carried out

Section 5 - Permit(s) to Work

  • Tasks requiring permit to work

  • Person who will issue and co-ordinate permits

  • Photo of issued permit(s)

Section 6 - Supervision

  • Person(s) responsible for supervision is

Section 7 - Workforce Details

  • Workforce required to carry out task, ie the number of people

  • Special skill sets required (ie a Bricklayer, an Electrician etc)

  • Details of competence cards (photos of cards)

Section 8 - Health and Safety Monitoring

  • Duty supervisor responsible for safety standards is

Section 9 - Plant Inspection and Operator Training

  • Types of plant to be used

  • Operators qualifications (photo of CPCS card)

  • Examination and maintenance details for above mentioned plant. (photo of documents)

Section 10 - Dis/Reconnection of Services

  • Services to be disconnected

  • How long will it be disconnected?

  • How long will it take to reconnect?

  • Person(s) carrying out dis/reconnection duties

  • Method of locating buried services

  • Person(s) declaring dis/reconnection

Section 11 - Hazardous Substances

  • Hazardous substances to be used

  • Communication to workers about health hazards achieved by?

  • Protective measures

  • Details of samplings

  • Photo of sampling reports or other documentation

Section 12 - Personal Protective Equipment (PPE)

  • Items of PPE/RPE required

Section 13 - Emergency Procedures

  • Details of emergency procedures including site evacuation

  • Photo's of supporting documents, signs, and information.

Section 14 - Environmental Controls

  • Threats to the environment

  • Environmental protection measures

  • Waste storage and disposal

Section 15 - Safety of the Public and Occupiers

  • What measures will be put in place to ensure safety of the public?

  • What measures will be put in place to ensure safety of occupants?

Section 16 - Public Nuisance

  • Possible sources of public nuisance

  • Person responsible for neighbourhood liaison

Section 17 - Briefing Register

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.