Title Page
-
Form Ref : PSDP-15 (Rev 03) Effective Date: 11.11.2019
-
Project Name
-
Project Location
-
Audit Date
-
PSCS: (Site Point of Contact)
-
Distribution List
-
Nature of Site Visit
- Preliminary Plan Preparation / Update
- Meeting with PSCS
- Design Team Meeting
- Co-ordination Visit
-
Programme Changes on site which may affect Health & Safety?
-
Any changes in scope / design on site which may affect health & safety?
-
Method Statements (sample / any concerns?)
Overall Site Impression (tick area(s) of concern)
-
Boundaries & Access
-
Ground Conditions
-
Existing Structures
-
Other work activities
-
Security Arrangements
-
Existing Services
-
Environmental Issues
-
Traffic Management
-
Deliveries Loading / Uploading
-
Storage Arrangements
-
Road Cleaning
-
Waste Management
-
Hazardous Materials
-
Other
-
Comments/Notes
-
Photos to support comments/notes
Particular Risks (Schedule 1)
-
Burial under earthfalls
-
Engulfment in swampland
-
Falling from height
-
Chemical or Biological substance
-
Ionising radiation
-
High voltage power lines
-
Risk of drowning
-
Work on wells, underground earthworks and tunnels
-
Work carried out by divers
-
Work carried out in a caisson
-
Work involving explosives
-
Assembly or disassembly of heavy prefabricated items
-
COMMENTS / NOTES (incl. other significant risks identified)
-
Photos of other significant risks identified
Temporary & Permanent Works Design
Temporary Works Design
-
Elements identified which require Temporary Works Design Certificate (e.g. shuttering, non-standard scaffold, propping, bearing, bracing, loading, hoarding, ladders, trench-boxes, formwork, trench shoring/support, working platforms, traffic mgt., haul roads, safety netting/fall arrest systems, goalposts etc.):
-
Temporary Works Designer / Engineer / Specialist Responsible
Permanent Works Design
-
Elements identified which require Permanent Works Design Certificate (e.g. roof, main structure, foundations, permanent walkways, ladders, working platforms, anchor systems, structural steel, edge protection, anchor design (FM-01/FM-02/FM-03):
-
Permanent Works Designer / Engineer / Specialist Responsible
Updates Required
-
Design Risk Assessments
-
Design Change Certificate
Verbal Discussion
-
Issued to
-
Brief Note
Written Direction
-
Issued to
-
Brief Note
Safety File & Comments
Safety File
-
Safety File Compilation Notes
General Comments
-
Any other General Comments/Notes
Communication and Sign Off
-
Full Name
-
Full Name