Title Page
-
Document No.
-
Principle Contractor
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Sub-contractor
-
Specialism
Sub-contractor Operational Site Compliance Audit
Personnel
-
Colt Site Manager
-
Sub-contractor's supervisor
-
Site operatives
Operatives Name
RAMS
-
Risk assessment and method statement available on site
-
RAMS have been signed by all operatives
Tool Box Talks
-
Is there evidence on site that tool box talks are being delivered
Tool Box Talk
-
Date of toolbox talk
-
Tool box talk title
Daily Activity Briefing Document (DABS)
-
DABS available and signed
-
DABS regularly signed
-
DABS signed on day of audit line up with tasks being carried out
Equipment Register
-
Equipment register available on site
Permit to Work Procedure
-
on-site procedures understood and explained
-
-
Ladder permit
-
Hot work permit
-
Electrical isolation
-
Confined space
-
Other
-
Describe other permit
Drawings
-
Drawing number
-
Enter drawing number
CSCS/ECS Card
-
CSCS/ECS Card details
Card description
-
Operatives name
-
Card type
-
Card colour/description
-
Serial number
-
Expiry date
-
Training
-
Site induction training completed
PASMA
-
Tower scaffold being used
-
Operatives name
-
Proof of competence
-
Tower tagged and in date
IPAF
-
Mobile Elevating Work Platform (MEWP) being used
-
Equipment description
-
Serial number
-
Operatives name
-
Proof of competence
-
Inspection documents available and in date
Personal Protective Equipment (PPE)
-
Hard Hat
- Being Worn
- No Evidence
- PPE being used is out of date or in poor condition
-
Safety Footwear
- Being Worn
- No Evidence
- PPE being used is out of date or in poor condition
-
Safety Glasses
- Available at point of use
- Is available but not worn
- Not Applicable
-
Safety gloves/hand protection
- Available at point of use
- Is available but not worn
- Not Applicable
-
High Visibility Vest
- Being Worn
- No Evidence
- PPE being used is out of date or in poor condition
-
Full body harness
- Is a harness available at point of use
- Is the harness being worn correctly
- Has the harness been inspected within the last 6 months
- proof of a pre use check
- Not applicable
-
Work positioning lanyard
- is a suitable lanyard available at point of use
- the lanyard is being used correctly
- the lanyard has been inspected in the last 6 months
- there is proof of a pre use check
- Not applicable
240v equipment
-
240v electrical equipment being used on site
-
Equipment description
-
Serial number
-
Portable equipment test (PAT) date
-
Compliance
Sign Off
Audit Sign Off
-
Audit completion date and time
-
Auditee's acceptance signature
-
Auditor's signature
-
Notes
Good practice
Good Practice
-
Good Practice Note
-
Enter good practice description
Observations
Observation
-
Observation
-
Enter observation note
Corrective action
Corrective Action
-
Corrective Action
-
Corrective action
-
Required by date
-
Completion date