Title Page
-
Audit Number:
-
Auditor and Lead Trade:
-
Planon Work Order Reference Number/Project Number:
-
Site Location
-
Contractor/Operative
-
Conducted on
-
Prepared by
Site
-
Current RAMS in place for activities & approved or Construction Phase Plan as applicable
-
Appropriate barriers/fences and signage in place
-
Fire escape routes kept clear
-
Hot works permit in place
-
Hot works area has appropriate extinguisher and is clear of combustible materials
-
Heat/smoke detectors are being suitably capped/uncapped
-
Roof work permit is in place
-
Appropriate other permits to work in place
-
Known and applied safe practice for isolation
-
Noise levels managed. Noisy work only taking place at agreed days/times
-
Quality of ventilation dust/fume management
-
Measures in place to prevent accidental damage
-
Housekeeping in and around the site is adequate
-
Storage and skip locations are well managed and as agreed
-
Equipment used for working at height appears adequate
-
Scaffold inspected in last 7 days
-
PAT labels in date
Welfare Facilities
-
Adequate welfare facilities available
Workers
-
Evidence that staff have relevant credentials to operate on site (e.g. CSCS, Green, TS cards, IPAF, LOLER, PUWER etc.)
-
Evidence that staff are wearing the correct PPE for the task in hand
Incident
-
Knowledge of where First Aid is available inc. emergency shower & eye wash stations (if relevant)
-
Knowledge of the incident/near miss process (HSI01)
Asbestos
-
Understands the UoE procedure of asbestos. Asbestos register or survey has been reviewed by workers
Observations and Recommendations
-
Positive Observations
-
Improvement Recommendations
-
Non-Compliance Details
-
Operative/Contractor Actions Required
-
Agreed Completion Dates
-
Remedied On Site?
-
Re-audit Required?
-
Re-audit within specified number of days:
-
Signed Auditor:
-
Signed Site Manager/Auditee:
-
Photo evidence available?
-
Photo evidence