Title Page
-
Project
-
Section No
-
Area Inspected
-
Weather Conditions
-
Date & Start Time
-
Prepared By
Health, Safety and Environment Inspection Checklist
-
Click "Add Item"
Item
-
Please select the items to be checked.
- Site Welfare
- Site Traffic Management
- Fire, First Aid & Emergency
- Confined / restricted Spaces
- Working at Height (beside deep excavations)
- Lifting Operations & Lifting Equip.
- Access Equipment
- Excavation inspection on all features over 600mm on site recorded in site diary.
- Start of shift briefing
- Site access and egress
- Temporary Electrical Services
- Housekeeping
- Health hazards
- Fuel and oil storage, handling, refuelling and spill kits.
- Permits to work
- Control of substances hazardous to health (COSHH)
- Personal protective equipment (PPE) including gloves and correct safety boots
- Risk assessment and Method Statements
- People Plant interface
- Manual handling techniques used, and operatives rotated for each task
- Storage of materials
- Excavations stepped for safe access/egress (stepped after 1m)
- Incidents procedure documented and known by supervisors.
- Waste management
- Noise, Dust and Vibration control (Health & Safety)
- Site security
- Ecology (animals and habitat)
- Tools and Equipment fit for use and intended purpose
- Public Interface
- Plant checks heats
- Reports, Records and Registers including signed physical capability validations before and after works each day
- Temporary Works
- Other H&S and Environmental issues
- Storage of remains
- Archaeology / heritage
- Barriers in place on large features
- Protection of trees & vegetation
- Hazardous waste management
- Contaminated land
- Noise and Vibration (Environmental)
- Spill kits
- Work near site drainage, watercourses
- Pollution of site drainage, watercourses
- Slip and trip hazards (effective use of EcoGrid)
- Supervisors visible and available at work location
- Stretching routines undertaken prior to works
-
Status of item.
Completion
-
Completed By : (Name & Signature)