Title Page

  • Conducted on

  • Prepared by

  • Location

High Rise Post Audit

  • Name of engineer being Audited

  • Address details
  • Building Owner

  • LDZ

  • Description of building owner

  • Type of building use

  • Estimated year of construction

  • Number of storeys

  • Number of flats per storey

  • Total number of flats

  • Have previous corrosion records been identified

General

  • Is there a cellar basement or underground garage

  • Has the engineer obtained an asbestos report

  • Building construction type

  • Meter positions and configurations

  • Diagram displaying current riser network available

Supply Pipe Details

  • Is the supply pipe entry point correctly identified?

  • Has the supply pipe material been captured correctly

  • Has the supply pipe diameter been identified correctly

  • Is there cathodic protection present and what is its condition ?

  • Is surveyed supply pipe distinguishable as Gas Pipework?

  • EP : Entry point has adequate access for inspection maintenance and Repair

  • EP: Entry point does not compromise building fire resistance

  • EP: Entry point does not compromise safe egress in an emergency

  • Insulation joint installed correctly

PIV Details

  • Has the pipeline isolation valve (PIV ) been located

  • PIV location correct

  • PIV location correctly referencing supply

  • Has DR4 process been raised

IIV Detail

  • Is an inlet isolation valve (IIV) Present and locatable

  • Has the location of the IIV been captured correctly?<br>

  • Is the IIV accessible for maintenance?

  • IIV, Has the IIV Been clearly identified as a gas valve

  • IIV , Is the IIV Accessible to members of the public ?

  • IIV ; If IIV is not located internally is it in a locked compartment at point where the pipeline enters the building

  • IIV : If IIV is located in a locked compartment is there advice where the keys may be found

  • IIV : Have permanent identification and gas escape notices been posted on or near the IIV

  • Has the handle been removed from the IIV

Riser Details

  • Number of external Risers

  • Number of internal Risers

  • EFV Installed on Riser

  • RIV: Has aRIV/ BIV been fitted to the maintenance and isolation of individual Risers

  • Riser Pipe Length

  • Has the Riser Pipe diameter been captured correctly

  • Has the Riser Pipe material been captured correctly

  • Has the Base of the Riser been checked

  • Is there evidence of any external building modifications that could affect the safety of the network pipe work

  • Is the Riser referenced to correct supply pipe

  • Has the percentage of the Riser visible been captured correctly

  • Can the base of the Riser be checked

  • Has corrosion be been identified on the Riser

  • Has the Riser location been correctly identified

  • Is the number of visible repairs correct

  • If so are they still fit for purpose

  • Is the Riser supported every 3mtr for horizontal

  • Is the Riser supported 2.5 mtr for vertical

  • After leakage has the engineer found and recorded locations

  • Has the leak been repaired and captured

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.