1.Documents
-
A. F10 Displayed
-
B.employers liability insurance (min £5m)
-
C. H&S law poster
-
D. Accident book
-
E. First aid adequately stocked
-
F. Permit to work
-
G. Hot works permit
-
H. COSHH Data sheets
-
I. Induction
-
J. Signing in process
-
K. Method Statements
-
L. Risk assessments
-
M. Safe systems of work
-
N. Asbestos identified on site
2.Certificates
-
A. CSCS Cards
-
B. Scaffold cards
-
C. ID badges
-
D. Forklift
-
E. Dumper
-
F. 360
-
G. Scissor lift
-
H. MEWP
-
I. First Aider
3.Site General
-
A. Access & egress
-
B. Trip/slip/fall hazards protected
-
C. Adequate lighting
-
D. Is site generally tidy
-
E. adequate welfare facilities
-
F. Adequate storage
-
G. Storage for COSHH
-
H. Waste stored appropriately
-
I. Regular waste removal
-
J. Adequate fencing (HERAS)
-
K. Barriers
4.Signage
-
A. Boots
-
B. Hard hat
-
C. Hi-Vis
-
D. Goggles
-
E. Ear Muffs
-
F. Cautions
-
G. Fire exits
5.Plant (inc Hand Tools)
-
A. All hand tools in good condition
-
B. Are power tools 110v
-
C. Pat testing
6.Machinery
-
A. Regular inspections
-
B. Guards in place
-
C. SWL tags
7.Ladders
-
A. Step ladders (class 1/2) to BSEN 131
-
B. Ladders (over 3m) securely fastened
-
C. Ladders (over 3m) extend by 1m
-
D. Ladders (over 3m) at 1:4 ratio
8.Scaffolding
-
A. 7 day inspection
-
B. anchor bolts (tied)
-
C. Hand rail (950mm)
-
D. Toe boards (150mm)
-
E. working platforms (600mm)
-
F. Brick guards / netting
-
G. Guard rails (470mm) gap
9.Mobile towers
-
A. Correctly erected
-
B. outriggers
-
C. Toe boards
-
D. Ratio 3:1
-
E. internal ladders
-
F. Wheels locked
10.PPE
-
A. Extra PPE available
-
B. Hard hats worn
-
C. Boots worn
-
D. Goggles worm
-
E. Hi-Visibility worn
-
F. Gloves worn
-
G. Ear defenders worn
-
H. Specialist (i.e. welding visor etc)
11.Fire Procedures
-
A. Evacuation Procedure
-
B. Training
-
C. Fire points
-
D. Adequate extinguishers
-
E. warning systems (siren/horn)
-
F. Regular Drills
12.Excavation
-
A. Access (ladder etc)
-
B. Barriers (fencing/tape etc)
-
C. Supported (trench sheets)
-
D. Battered
Corrective Action Required
-
Any corrective action to report on
General Comments
-
Comments
-
Site images
Signature
-
Auditor's signature
-
Site Representative