Information
-
Audit
-
Job Name and #
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
HILOAD FRAME POUR CHECKLIST
-
Do you have a sealed drawing on site for this pour ?
-
Is shoring installed the same as sealed drawing ?
SHORING FRAMES
-
IS SHORING VISUALLY PLUMB?
-
ARE ALL SCAFFOLD BRACES INSTALLED?
-
ARE SCAFFOLD RIVET & HITCH PIN IN PLACE (if required)
-
DOES SCAFFOLD SCREWJACK EXTENSION MEET THE SEALED DRAWING REQUIREMETS?
-
ARE ALL SCAFFOLD RESTING ON A BASEPLATE ?
STRINGER & JOISTS
-
IS SCAFFOLD LAYOUT AND STRINGER SPANS BY THE SEALED DRAWINGS ?
-
IS STRINGER USED THE SAME AS SHOWN ON THE DRAWING?
-
IS JOISTS SPACING BY THE DRAWING?
-
ARE THE JOISTS USED THE SAME AS SHOW ON THE DRAWING?
SUBGRADE INFORMATION
-
IS THE SLAB ON GRADE IN PLACE ? <br><br>
-
IF SLAB ON GRADE IS NOT IN PLACE IS COMPACTION AND BEARING ENOUGH FOR THE LEG LOAD?<br>
-
IS THE MUDSILL LAYOUT BY THE SEALED DRAWING?
-
HAVE EFFORTS BEEN MADE TO PREVENT RUNOFF FROM WASHING UNDER MUD PADS DURING HEAVY RAINS ?
RESHORE
-
ARE ALL MUDSILLS CENTERED UNDER THE FRAME LEG AND COMPLETELY BEARING ON DIRT/GRAVEL?
-
IS RESHORE REQUIRED LEG-LEG ?
-
HOW MANY FLOORS OF RESHORE ARE REQUIRED ?
-
ARE THE RESHORE CLIPS IN PLACE ?
-
DOES THE FLOOR BELOW MEET THE STRENGTH REQUIREMENT BASED ON THE RESHORE SECTION ?
-
ARE RESHORES VISUALLY PLUMB ?
-
ARE THE RESHORE PINS COMPLETELY INSERTED AND ARE THE RESHORES SNUG ?
-
ARE PERIMETER RESHORES TIED WITH A ROPE TO PREVENT FALLING FROM BUILDING ?
-
IS THE OUTRIGGER RESHORED THE SAME NO. OF FLOORS AS THE TYPICAL RESHORES ?