Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Add location
1.0 External
-
1.1 All signage lighting operational and clean.
-
1.2 All down pipes, drains and channels are undamaged.
-
1.3 All external doors are operational.
-
1.4 Report any damaged glass.
-
1.5 Remove any graffiti.
-
1.6 Check condition of paintwork.
2.0 Shop Floor
-
2.1 Check condition of entrance matting, flooring, heating, ceiling and lighting.
-
2.2 Check all ceiling tiles.
-
2.3 Check all stair nosing's and banister's
-
2.4 Identify all non operational lamps.
-
2.5 Check any damaged fixtures or counters.
-
2.6 Identify any areas requiring decoration.
-
2.7 Check all carpets for trip hazards.
-
2.8 Check all counter caches for correct operation.
-
2.9 check condition of till points.
-
2.10 inspect condition of changing room doors, curtains, hooks, decor, mirror and flooring.
-
2.11 Check carpets for chewing gum, marks, damage etc.
-
2.12 Ensure entrance door locks are working.
-
2.13 Check entrance doors are fully operational.
-
2.14 Ensure CCTV is operational
3.0 Staff/Storage Areas
-
3.1 Check all ceiling tiles.
-
3.2 identify non operational lamps.
-
3.3 Check all flooring for trip hazards.
-
3.4 Identify any areas that require decoration.
4.0 Toilets
-
4.1 Check all cubicles and fixtures.
-
4.2 Check operation of taps and condition of pipe work.
-
4.3 check condition of sanitary ware
-
4.4 Check condition of fixtures fittings in baby change facilities.
-
4.5 Check all ceiling tiles.
-
4.6 Check the integrity of the paint work.
5.0 Electrical
-
5.1 Check trailing leads, extensions and socket outlets for damage.
-
5.2 Check operational of all digital and electronic locks.
6.0 General
-
6.1 Check condition of roofs.
-
6.2 Check for any risk from or to neighbouring properties.
7.0 Other
-
7.1 Check condition of beauty rooms lighting, drains and counters etc.
-
7.2 Check condition of lighting flooring drainage and toilets in restaurant.
Plant and equipment
-
8.1 Condition of AHU's.
-
8.2 Condition of boiler plant
-
8.3 Condition of chiller plant.
-
8.4 Condition of Split units and FCU's
-
8.5 Condition of pipe work and cabling.
-
8.6 General condition of Plant rooms.
-
8.7 Condition of switch gear and switch rooms.
-
8.8 Condition of over door curtains.
-
8.9 Condition of BMS.
-
Select date
-
Add signature