Information
-
Prepared by
-
Box Number
-
Hopper #
-
Phase #
-
Conducted on
Structural Repairs
1.
-
Have all hopper structural repairs been completed and signed off by Contractors Quality Control Representative and HRC? (N/A if no repairs were required)
-
Please add comment and / or annotated picture
-
QC Rep. Signature
-
QA Rep. Signature
Hopper Heaters
Hopper Heaters
-
Have all hopper heaters been installed, tested, and signed off by Contractors Quality Control Representative
-
Please enter comment and / or annotated picture of the issue
-
QC Rep. Signature
-
QA Rep. Signature
Wire Mesh
Wire Mesh
-
Has all the wire mesh been installed and inspected by the Contractors Quality Control Representative
-
Please enter comment and / or annotated picture of the issue
-
QC Rep. Signature
-
QA Rep. Signature
Heater Testing
Heater Testing
-
Have all heaters been retested to ensure that the previous Contractor has not disturbed the unit or wiring during their work scope?
-
Add media
-
QC Rep. Signature
-
QA Rep. Signature
Insulation
-
Has all the insulation been installed and inspected by the Contractors Quality Control Representative
-
Add media
-
QC Rep. Signature
-
QA Rep. Signature
Heater Testing - Post Insulation
Hopper Heater Testing - Post Insulation
-
Have all the heaters been retested to ensure that the previous Contractor has not disturbed the unit or wiring during their work scope?
-
Add media
-
QC Rep. Signature
-
QA Rep. Signature
Final Insulation Inspection
Final Insulation Inspection
-
Has a final inspection been performed of all insulation activities associated with the hopper by the Contractors Quality Control Representative?
-
Add media
-
QC Rep. Signature
-
QA Rep. Signature
Hopper Flanges
Hopper Flanges
-
Have all hopper flanges (and outlet piping flange) been inspected?
-
Add media
-
QC Rep. Signature
-
QA Rep. Signature
Flange Machining
Flange Machining
-
Have all Flanges been machined and inspected? (N/A if no machining was required)
-
Add media
-
QC Rep. Signature
-
QA Rep. Signature