Information
-
Host Business name
-
Address
-
Conducted on
-
Prepared by
-
Host representative.
-
Host contact details, Email, phone number
-
Host Employers QBCC licence number
-
Host Employers total qualified staff.
-
Host Employers direct employed apprentices.
-
Host Employers GTO employed apprentices.
-
Inspection number
WorkCover and Public liability certificates
-
WorkCover Certificate of currency
-
Public liability certificate of currency
Host Employer Annual Audit
1. WHS Documentation
-
1.1 Does the Host inspected have an up to date WHS Management Plan?
-
1.2 Do all employees have access to the WHS management plan?
-
How do they have access?
-
1.3 If any high risk work is being conducted in the business, do the workers sign on to the Safe Work Method Statement, and are they site specific?
-
1.4 What incident / injury report system is currently in place?
- Digital
- Paper vision
-
Is it Digital or Paper based
-
1.5 Does the Host provide a company induction?
-
1.6 Does the Host conduct site specific induction?
-
1.7 Does the host company have a dedicated OHS person providing advise? Who?
-
1.8 Does the Host company run Toolbox meetings?
-
How often?
-
1.9 Is there any other safety training provided to staff and PAV/PAQ Apprentices.
-
What sort of training?
2. SWMS - 19 High risk construction work categories.
-
2.1 Involving Demolition
-
2.2 Involving a confined Spaces
-
2.3 On or near chemical, fuel or refrigeration lines.
-
2.4 Involving tilt-up or precast concrete.
-
2.5 Where the is a risk of a person falling more than 2mtrs.
-
Is there a rescue plan?
-
2.6 On or near Pressurised Gas piping or mains.
-
2.7 In areas where there are artificial extremes of temperature.
-
2.8 Trenching and excavation depth over 1.5mtrs?
-
Is there a rescue plan ?
-
2.9 On or near energised electrical installations or services.
-
2.10 On or adjacent to roadways or railways used by road or rail traffic
-
2.11 In areas that may have a contaminated or flammable atmosphere.
-
2.12 Involving the use of explosives.
-
2.13 At workplaces where there is any movement of powered Mobile Plant.
-
2.14 Structural alterations that require temporary support to prevent collapse.
-
2.15 Involving a tunnel.
-
2.16 In, over or adjacent to water or other liquids where there is a chance of drowning.
-
2.17 Involving diving.
-
2.18 Involving removal or likely disturbance of asbestos (note: Preparation of asbestos control plan is taken to be preparation of a swms)
-
2.19 On telecommunications towers.
Corrective Actions
-
Corrective Action to be taken.
Signed off
-
Is the Annual meeting complete?
-
Master Plumbers Representative
-
Host Client Representative
-
Date completed
-
On completion of this Host client WHS Inspection Checklist please send/export the document to <
> and forward a copy to the Manager. Any action items forward these to the Host employer.