Information
-
Document No.
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Requestor details
-
Company Name of Permit requestor
-
Contact details of the permit requestor supervisor
Permit Details
-
Time and Date permit becomes active
-
Time and Date permit will become deactive
RAMS
-
RAMS
-
Permit issued to
-
Description of the Hot Work to be undertaken
-
Sketch of location if required
-
Fire fighting equipment to be on hand as part of this activity
-
Fire extinguisher
-
Sand bucket
-
Water supply
-
Fire blanket
-
Other equipment to be at the ready for this activity
Control Measures
-
What will be the method for raising the alarm, should a fire break out
-
Details of raising the alarm
-
Drains and Pits are covered or isolated
-
Is the area adequately ventilated
-
Spark flash screens in place
-
Area isolated or barricaded off
-
Fire load reduced, protected or isolated
-
Fire equipment has been checked, laid out and is fit for purpose.
-
Will weather conditions potentially effect this task, if so what extra precautions will be enlisted
-
Other details
Weather conditions if relevant
-
If weather conditions such as wind or excessive heat will impact on the activity, what precautions will be taken
Permit Cancelation
-
Notes or relevant details if required
-
Time and Date permit terminated
-
Staff member terminating this permit