Title Page
-
Document Number
-
Site conducted
-
Conducted on
-
Prepared by
-
Hot work is being performed by
-
Date and start time
-
Nature of Jobs
-
Name of person(s) doing Hot Work
-
Signature of person applying for Hot Work Permit
Precautions Checklist
-
Available hose streams, and/or 20lbs. Fire extinguisher are in service
-
Hot work equipment in good repair
Requirements within 25 feet of work
-
Flammable liquids, dust, lint and oil deposits removed
-
Explosive atmosphere in the area removed.
-
Floors swept clean.
-
Combustible floors wet down, covered with damp sand or fire resistant sheets.
-
Remove other combustibles where possible. otherwise protected with fire blankets or metal shields
-
All wall and floor opening covered.
-
Fire blankets suspended beneath work.
Work on wall and floor openings covered.
-
Construction is noncombustible and without combustible coverin or insulation.
-
combustibles on the other side of walls moved away.
-
Enclosed equipment cleaned of all combustibles
-
Containers purged of flammable liquids/vapors.
Fire watch/ hot work area monitoring
-
Fire watch personnel will be provided during and for 30 minutes after work (including any coffee or lunch breaks).
-
Fire watch personnel are supplied with suitable extinguisher.
-
Fire watch personnel are trained in use of this equipment and in sounding alarm.
-
Fire watch personnel are/may be required for adjoining areas above and below
-
Monitor hot work area for 30 minutes after job is complete
other precautions taken
-
Confined entry permit?
-
Area protected with smoke or heat detection?
-
Ample ventilation to remove smoke/vapor from work area.
-
Lockout / Tagout / Try out locks required?
I Verify the above location has been examined, the precautions checked to prevent fire, and permission is authorized for work.
-
Signed
-
Permit Expires (24 hours from star)
Cancellation:
-
I verify the hot works job as outlined on this permit has been completed, all requirement have been met, and termination of the permit is requested