Title Page
-
Location
-
Date
-
Permit Authorizing Individual (PIA)
-
Individual Performing Hot Work
-
Scope of Work
-
Time Started
-
Time Finished
Requirements
-
Available sprinklers, hose streams, and extinguishers are in service and operable
-
Hot work equipment is in good working condition in accordance with manufacturer's specifications
-
Special permission obtained to conduct hot work on metal vessels or piping lined with rubber or plastic
Requirements within 35 ft (11 m) of hot work
-
Flammable liquid, dust, lint, and oily deposits removed
-
Explosive atmosphere in area eliminated
-
Floors swept clean and trash removed
-
Combustible floors wet down or covered with damp sand or fire-resistive/noncombustible materials or equivalent
-
Personnel protected from electrical shock when floors are wet
-
Other combustible storage material removed or covered with listed or approved materials (welding pads, blankets, or curtains; fire-resistive tarpaulins), metal shields, or noncombustible materials
-
All walls and floor openings covered
-
Ducts and conveyors that might carry sparks to distant combustible material covered, protected, or shut down
Requirements for hot work on walls, ceilings, or roofs
-
Construction is noncombustible and without combustible coverings or insulation
-
Combustible material on other side of walls, ceilings, or roofs is moved away
Requirements for hot work on enclosed equipment
-
Enclosed equipment is cleaned of all combustibles
-
Containers are purged of flammable liquid/vapor
-
Pressurized vessels, piping, and equipment removed from service, isolated, and vented
Requirements for hot work fire watch and fire monitoring
-
Fire watch is provided during and for a minimum of 1 hour after hot work, including any break activity
-
Fire watch is provided with suitable extinguishers and, where practical, a charged small hose
-
Fire watch is trained in use of equipment and in sounding alarm
-
Fire watch can be required in adjoining areas, above and below
-
Per the PAI/fire watch, monitoring of hot work area has been extended beyond 1 hour