Title Page
-
Site conducted
-
Conducted on
-
Completed by
-
PPM Task Number
-
Check x2 500ml bottles in each area are sealed and in date.
Check x2 Eye Pads are located with Bottles
Inspections
-
Check x2 500ml bottles in each area are sealed and in date.
Check x2 Eye Pads are located with Bottles -
CBRE Workshop
-
Basement (PL5) x2
-
E Battery Room
-
F Battery Room
-
B Chiller (PL8)
-
A Chiller (PL7) x2
-
Boiler Room (PL7)
-
Absorption Chiller (PL7)
-
Generator Room
-
Fork Lift Shed