Title Page

  • HQRD VIR

  • Select date

  • Weather

  • Rainfall since last inspection (mm)

  • Visibility

  • Dam level (m AHD) (FSL=283 m AHD)

  • Is there any evidence of algae

Reservoir banks

  • Slips/Erosion

  • Cracking

  • Comments or additional information

  • Add photos of any changes from previous inspections

Upstream batter

  • Slips/Erosion

  • Cracking

  • Settlement

  • Comments or additional information

  • Add photos of any changes from previous inspections

Crest

  • Slips/Erosion

  • Cracking

  • Settlement

  • Comments or additional information

  • Add photos of any change since last inspection

Crest piezometers (left to right)

  • P1a

  • P1

  • P2a

  • P2

  • CLa

  • CL

  • P3a

  • P3

  • CRa

  • CR

  • P4a

  • P5a

  • Add photos of any changes from previous inspections

Downstream batter

  • Slips/Erosion

  • Cracking

  • Settlement

  • Seepage

  • Comments or additional information

  • Add photos of any changes from previous inspections

Downstream toe

  • Slips/Erosion

  • Cracking

  • Settlement

  • Seepage

  • Changes in colour of seepage

  • Comments or additional information

  • Add photos of any changes from previous inspections

Spillway approach (Primary and secondary)

  • Slips/Erosion

  • Cracking

  • Settlement

  • Comments or additional information

  • Add photos of any changes from previous inspections

Spillway culverts

  • Slips/Erosion

  • Cracking

  • Settlement

  • Seepage

  • Concrete panel misalignment

  • Condition of seals between concrete panels

  • Comments or additional information

  • Add photos of any changes from previous inspections

Spillway (primary) excavation batters

  • Slips/Erosion

  • Cracking

  • Settlement

  • Seepage

  • Comments or additional information

  • Add photos of any changes from previous inspections

Spillway chute

  • Slips/Erosion

  • Cracking

  • Settlement

  • Seepage

  • Concrete panel misalignment

  • Condition of seals between concrete panels

  • Comments or additional information

  • Add photos of any changes from previous inspections

Spillway stilling basin

  • Slips/Erosion

  • Cracking

  • Settlement

  • Seepage

  • Condition of seals between concrete panels

  • Comments or additional information

  • Add photos of any changes from previous inspections

Spillway (secondary) excavation batters

  • Cracking

  • Slips/Erosion

  • Settlement

  • Seepage

  • Comments or additional information

  • Add photos of any changes from previous inspections

Outlet works

  • Valve condition (irrigation isolation)

  • Valve condition (irrigation flow control)

  • Valve condition (dump)

  • Leaks from flanges and fittings

  • Condition of fittings

  • Outlet flow rate (ML/day)

  • Total flow reading

  • Comments or additional information

  • Add photos of any changes from previous inspections

V-Notches

  • Outlet (mm)

  • Spilling basin (mm)

  • Aerator (mm)

  • Toe centre (mm)

  • Toe centre piezo reading

  • Toe right (mm)

  • Toe right piezo reading

  • Is there any changes in colour in the flows?

  • Comments or additional information

  • Add photos of any changes from previous inspections

  • Is there any sign of unauthorized entry or damage to the site?

Summary and Sign-off

  • Is a phone call to the dam safety engineer required due to any changes or issues observed?

  • Sign on completion of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.