Project Management

  • Construction Phase Plan in place. If PW are PC, the plan must be signed and published on to Union Square. <br>

  • Level of site supervision and management satisfactory

  • The site team are using Union Square and have implemented the management framework document

  • The project has access to suitable ICT (information and communications technology) equipment

  • Any comments

Project arrangments

  • Welfare arrangements are suitable and sufficient

  • Housekeeping maintained and satisfactory

  • Site signage suitable and sufficient - PW project poster in use?

  • Storage areas suitable and sufficent

  • Access and egress arrangements

  • Security arrangements suitable and sufficent

  • Are inductions recorded and operatives competences checked?

  • Sample of site operatives
  • Name of operative

  • Does the operative have a current and appropriate competence card.

  • Has the operative been inducted

  • Has the operative signed on to an appropriate RAMS

  • Is the operative wearing the correct ppe

  • Working environment satisfactory

  • Are there training and communication arrangements in place

  • Any comments

Health management

  • Health hazards - Asbestos managed

  • Health hazards - Dusts and silica managed

  • Health hazards - Noise managed

  • Health hazards - Vibration managed

  • Health hazards - Other (night shifts, stress, biological, chemical, etc) managed

  • Any comments

Risk management

  • RAMS. In place, signed by operatives and reviewed for suitability by a site lead within the last three months.

  • RAMS register and subcontractor RAMS quality control sheets in place

  • Permit to work and other safe working arrangements (e.g when working at height) suitable and sufficient<br><br><br>

  • PPE used correctly - suitable and sufficient?

  • Any comments

Emergency management

  • Emergency plans in place (fire, incidents, etc)

  • Fire fighting equipment in place

  • Emergency routes clearly identified, suitably and free from obstructions

  • First aid provision suitable and sufficient

  • Any comments

Site inspections

  • Plant and equipment weekly inspections up to date and correctly documented

  • Current certificates of examinations and inspections

  • Zero accidents, incidents and / or near miss events

  • Plant and equipment suitable and sufficient for the tasks and being used correctly

  • Supervisors inspections once a week, engineers and managers inspections once a month.

  • Users of the plant and equipment are trained and competent

  • Any comments

Supply chain management

    Sample of contractors
  • Name of contractor

  • Have the contractors operatives signed on to the RAMS

  • Are the works being carried out by the contractor covered on a quality checked and approved RAMS

  • Is the contractor approved for use

  • Sample of suppliers
  • Name of supplier

  • Are there approved?

Environmental management

  • Waste streams managed on site

  • Has the person responsible for receiving the waste transfer notes been training using the internal training document

  • Waste disposal arrangements (licensed carrier, transfer notes held for 3+ years, discharge licence) in place

  • Sample of Waste carriers
  • Name of waste carrier

  • Does the waste carrier hold a waste carriers licence

  • Waste carrier licence number

  • Waste carriers licence expiry date

  • Is the waste transfer note clear and contain all the required information

  • Environmental nuisance - dusts and noise managed

  • Zero Incidents / spills

  • Are all aspects and/ or impacts managed

  • Any comments

Quality management

  • Have all findings/ non conformances from previous inspections and audits been closed out

  • Is there a quality plan in place and a test and inspection plan, and is it easily accessible to the site team and being followed

  • Are the correct document management controls (including the project index) being used and documents are being saved to Union Square

  • Sample of drawings being used on site

  • Drawings
  • Drawing title

  • Drawing number

  • Issue status

  • Add media

  • Is the client satisfied with the team and works being carried out

  • Drawing registers in place and accessible to the site team

  • Quality of works

  • Any comments

Signatures and comments

  • Signature of person assisting the inspection

  • Signature of person carrying out the inspection

  • Any comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.