Project Management
-
Construction Phase Plan in place. If PW are PC, the plan must be signed and published on to Union Square. <br>
-
Level of site supervision and management satisfactory
-
The site team are using Union Square and have implemented the management framework document
-
The project has access to suitable ICT (information and communications technology) equipment
-
Any comments
Project arrangments
-
Welfare arrangements are suitable and sufficient
-
Housekeeping maintained and satisfactory
-
Site signage suitable and sufficient - PW project poster in use?
-
Storage areas suitable and sufficent
-
Access and egress arrangements
-
Security arrangements suitable and sufficent
-
Are inductions recorded and operatives competences checked?
Sample of site operatives
-
Name of operative
-
Does the operative have a current and appropriate competence card.
-
Has the operative been inducted
-
Has the operative signed on to an appropriate RAMS
-
Is the operative wearing the correct ppe
-
Working environment satisfactory
-
Are there training and communication arrangements in place
-
Any comments
Health management
-
Health hazards - Asbestos managed
-
Health hazards - Dusts and silica managed
-
Health hazards - Noise managed
-
Health hazards - Vibration managed
-
Health hazards - Other (night shifts, stress, biological, chemical, etc) managed
-
Any comments
Risk management
-
RAMS. In place, signed by operatives and reviewed for suitability by a site lead within the last three months.
-
RAMS register and subcontractor RAMS quality control sheets in place
-
Permit to work and other safe working arrangements (e.g when working at height) suitable and sufficient<br><br><br>
-
PPE used correctly - suitable and sufficient?
-
Any comments
Emergency management
-
Emergency plans in place (fire, incidents, etc)
-
Fire fighting equipment in place
-
Emergency routes clearly identified, suitably and free from obstructions
-
First aid provision suitable and sufficient
-
Any comments
Site inspections
-
Plant and equipment weekly inspections up to date and correctly documented
-
Current certificates of examinations and inspections
-
Zero accidents, incidents and / or near miss events
-
Plant and equipment suitable and sufficient for the tasks and being used correctly
-
Supervisors inspections once a week, engineers and managers inspections once a month.
-
Users of the plant and equipment are trained and competent
-
Any comments
Supply chain management
-
Sample of contractors
-
Name of contractor
-
Have the contractors operatives signed on to the RAMS
-
Are the works being carried out by the contractor covered on a quality checked and approved RAMS
-
Is the contractor approved for use
- Sample of suppliers
-
Name of supplier
-
Are there approved?
Environmental management
-
Waste streams managed on site
-
Has the person responsible for receiving the waste transfer notes been training using the internal training document
-
Waste disposal arrangements (licensed carrier, transfer notes held for 3+ years, discharge licence) in place
Sample of Waste carriers
-
Name of waste carrier
-
Does the waste carrier hold a waste carriers licence
-
Waste carrier licence number
-
Waste carriers licence expiry date
-
Is the waste transfer note clear and contain all the required information
-
Environmental nuisance - dusts and noise managed
-
Zero Incidents / spills
-
Are all aspects and/ or impacts managed
-
Any comments
Quality management
-
Have all findings/ non conformances from previous inspections and audits been closed out
-
Is there a quality plan in place and a test and inspection plan, and is it easily accessible to the site team and being followed
-
Are the correct document management controls (including the project index) being used and documents are being saved to Union Square
-
Sample of drawings being used on site
Drawings
-
Drawing title
-
Drawing number
-
Issue status
-
Add media
-
Is the client satisfied with the team and works being carried out
-
Drawing registers in place and accessible to the site team
-
Quality of works
-
Any comments
Signatures and comments
-
Signature of person assisting the inspection
-
Signature of person carrying out the inspection
-
Any comments