Title Page

  • Site conducted

  • Conducted on

  • Conducted By

  • Location

  • DWG No.

  • Task Description

Part A - Pre-Concrete Checks

  • Check Correct Drawings

  • Initial Setting Out

  • Formation

  • Falsework

  • Formwork

  • Reinforcement

  • Boxout/Stop Ends/ Water Bar

  • Lines and Levels

  • Encast Items

  • Cleanliness/Formation

  • Services

  • Drainage

  • Checked by Moortown

  • Checked by Others

Part B - Permission Requested to Pour Concrete

  • Estimated Volume

  • Mix Details

  • Date of Request

  • Requested By

  • Permission Granted to Place Concrete By:

Part C - Concrete Pour Information

  • Date Concrete Poured

  • Concrete Delivery Ticket Nos

  • Test Cubes Ref.

Items

  • Volume Placed

  • Placement Method

  • Curing Method

  • Stripping

  • Slump

  • Checked By Moortown:

Part D

  • 7 Day Cube Results

  • 14 Day Cube Results

  • 28 Day Cube Results

  • Lines & Levels

  • Visual Inspection

  • Inspected By Client

  • Inspected By Moortown

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.