Title Page
-
Installation Date:
-
Installer (Name and Company):
-
Sign Owner (Company or Authority etc):
-
Service Agent (Which company is responsible for ongoing Maintenance):
-
Sign Serial Number:
Sign
-
Site/Location Name:
-
Is the sign installed according to the Installation Instructions?
-
Please specify
-
Sign Orientation (e.g. North / West, Northwest etc.)
-
Is anything obstructing the visibility of the sign for road users?
-
Please provide details of the obstruction and why it can't be resolved?
-
Sign Installation Quality (Upload Image)
Sign Power
-
Sign power method
-
Please Specify
-
Have the batteries been installed and connected? (Upload Image)
-
Does the solar panel have a clear and unobstructed view of the sky?
-
Is the solar panel facing North?
-
Please specify direction and reason.
-
Is the solar charger indicating that it is charging?
-
Has power been connected to sign (upload image of point of connection in the sign)?
-
Has the Electrical Compliance been received/arranged?
-
Please provide the details on why this hasn't happened?
-
Provide Compliance number:
-
Is the sign powered on?
-
Have the batteries been installed and connected (upload image)?
-
Has power been connected to sign (if so, upload image of point of connection inside the sign)?
-
Has the Electrical Compliance been received/arranged?
-
Please provide the details on why this hasn't happened?
-
Provide Compliance number:
-
Is the battery charger indicating that it is charging when powered on?
Comms
-
Host Type
-
Specify cloud type (e.g. what platform is used to the host the sign)?
-
Is the sign communicating with the Host?
-
Provide Serial number of local controller?
-
Has the operating manual been left with the user?
-
Provide person's name that the manual has been left with:
-
Activation Check
-
Upload image of operating sign
Pole & Accessories
-
Has the pole been secured into the socket (i.e has the grub screw been tightened)
-
Have the supplementary signs been fitted to pole?
Final Checklist
-
Have all Customer requirements been completed? i.e RAMM
-
Upload image of front of the installed sign (close up)
-
Upload image of back of the installed sign (close up)
-
Upload image of front of the installed sign (wide angle / from a distance)
-
Upload image of back of the installed sign (wide angle / from a distance)