Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
1.0 Site Entry / Boundaries
-
1.1 Are project signs displayed and secured at the gate and at appropriate intervals along the fence line?
-
1.2 Is the site evacuation sign displayed at the evacuation point?
-
1.3 Are site boundary fences maintained and appropriate for the site?
-
1.4 Is site vehicle and plant movement controlled and speed limit signs posted as necessary?
-
1.5 Is the location of the site office identified?
-
1.6 Is visitor and site parking adequately located and identified to minimise interaction with site plant?
2.0 Traffic Management
-
2.1 Is the TMP current, signed and filed in the PMP?
-
2.2 Is the Vehicle Management Plan completed, current and on display?
-
2.3 Are traffic barricades erected in accordance with the TMP and do not pose a risk to traffic, pedestrians and workers?
-
2.4 Are qualified traffic controllers on site?
3.0 Hazardous Substances / Dangerous Goods
-
3.1 Has a Hazardous Substances register been completed?
-
3.2 Are Safety Data Sheets provided for all chemicals onsite and current (within 5 years) ?
-
3.3 Are all chemicals stored as defined in the S.D.S?
-
3.4 Is there a well stocked spill kit available for use?
-
3.5 Has bundling been provided for bulk storage tanks?
4.0 Excavations and Trenches
-
4.1 Are permits to excavate in place and current for the works being performed. Are relevant personnel inducted into permit?
-
4.2 Are regular trench inspections being carried out and recorded?
-
4.3 Are unattended excavations / holes barricaded?
-
4.4 Is benching, battering and shoring as per required?
-
4.5 If shoring is being used, is it as per the requirements defined in WMS 04?
-
4.6 Has a Geotechnical Engineer reviewed excavations
-
4.7 Will Geotechnical review be required for future works?
-
4.8 Is access into excavations adequate and safe?
-
4.9 Is spoil adequately removed from the edges of the trench?
-
4.10 Is dewatering being carried out as required?
-
4.11 Is the plant being used appropriate for the task being performed?
5.0 Overhead services
-
5.1 Are overhead services present onsite?
-
5.2 Has a risk assessment been completed?
-
5.3 Are overhead services identified as necessary? (Tiger tags, exclusion zones, signage)
-
5.4 Is an appropriately qualified spotter on site controlling these works?
-
5.5 Are exclusion zones marked appropriately for the site conditions?
6.0 Electrical / Power tools
-
6.1 Is the electricians certificate of installation for the compound current and available?
-
6.2 Are all electrical equipment tagged and tested (within current date) and in safe working order?
-
6.3 Are safety switches (RCD'S) fitted to power supplies, tagged and tested (within current date) ?
-
6.4 Are all electrical appliances tested and tagged (within current date) and in safe working order?
-
6.5 Is correct P.P.E being worn as required?
-
6.6 Are generators being operated safely and as intended?
-
6.7 If used, are extension leads not more than 25 metres long and off the ground where possible?
7.0 Lifting equipment
-
7.1 Equipment tested and current tags in place(6 monthly)?
-
7.2 Is a lifting register onsite and current?
-
7.3 Slings free from cuts and tears?
-
7.4 Equipment in good condition free of damage and stored correctly?
8.0 Plant and equipment (including hired equipment)
-
8.1 Operators licensed / deemed competent to operator mobile plant / equipment?
-
8.2 Anti-Burst valves fitted to excavators / backhoes used for lifting?
-
8.3 Plant fitted with flashing lights?
-
8.4 Are safety pins being used?
-
8.5 Spotters or traffic controllers used?
-
8.6 Safe refuelling practices used?
-
8.8 Hire equipment covered by appropriate insurance?
-
8.9 Hired equipment stored correctly to ensure insurance cover?
9.0 Confined space
-
9.1 Is confined space work being performed?
-
9.2 Has a permit, risk assessment and sign off been completed correctly?
-
9.3 Are all relevant workers trained and certified in confined space works?
-
9.4 Is all the equipment available?
-
9.5 Is all the appropriate equipment being used?
-
9.6 Is the rescue plan completed and reviewed by relevant workers?
10.0 Sub-contractors
-
10.1 Are all sub-contractors inducted onto the site?
-
10.2 Have all sub-contractors on site signed into the "SIGNONSITE" app or the site register
-
10.3 Are the sub-contractors working under an approved WMS?
-
10.4 Are sub-contractors complying with their WMS?
-
10.5 Are all sub-contractors licensed for the works they are performing?
-
10.6 Is there proof of current sub-contractor insurance and workers compensation available?
11.0 Environmental
-
11.1 EMP signed and on site?
-
11.2 Approved plans and environmental controls defined in the EMP applied?
-
11.5 Is the standard of house keeping acceptable?
-
11.6 Are silt fences and silt traps in place and working as expected? And checked in C14?
-
11.7 Are roadways and adjacent waterways clear of signs of sediment and dirt?
-
11.8 Are dust levels acceptable?
-
11.9 Are noise levels acceptable?
-
11.10 Is noise monitoring required?
-
11.11 Are vibration levels acceptable?
-
11.12 Are cultural heritage constraints identified and managed?
-
11.13 Is recycled water being used onsite?
-
11.14 Is a Waste Water Management Plan required and defined?
-
11.15 Are protected trees adequately identified and protected?
-
11.16 Are site exit shake downs adequate and maintained correctly?
12.0 General / Site compound
-
12.1 Is the PMP on site and signed?
-
12.2 Are emergency procedures completed and displayed?
-
12.3 Has the project hazard identification and risk assessment been completed and displayed (D11/ HAM) ?
-
12.4 Toolbox sessions appropriate, regular and recorded?
-
12.10 Are site safety notices displayed prominently?
-
12.11 Are safety committee minutes displayed?
-
12.12 Is the emergency information displayed?
-
12.18 Are material storage areas clearly defined and tidy?
13.0 Other
-
Additional comments?
-
Follow up actions
-
Auditor signature
-
Auditees signature
-
Have all the follow up actions been completed?
-
Safety Managers Signature
-
Construction Managers signature