Title Page
-
Document No.
-
HVAC Daily Risk Assessment
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Client Contact
-
Have you made contact with the client since arriving on site to discuss the works you wish to carry out on this visit?
-
What HVAC System are you working on during this visit?
- LPHW systems
- Chilled Water System
- Primary Air Supply and Extract System
- DHW System
- Critical Cooling System
- Monitored Alarm Systems
- Fan Coil Units
- Lighting
- Pumps
- Extract Fans
-
Have you inspected the area where you will carry out your works
-
Is your work area in a condition that will allow you to perform you task safely?
-
Is there ease of access to your work area?
-
Are there other people in you work area
-
Will they be safe or at risk when you carry out your works?
-
What control measures will be put in place.
- Ask them to leave the area until works are completed.
- Carry out the works at a time when they are not in the area.
- Another