Information
-
Inspection Date:
-
Maintenance Site Store and Store number:
-
Service Provider to Store
-
Asset Specialist Name:
Equipment Inspection Checklist
Main AHU
-
Main Air Handling equipment inspected on this maintenance visit?
-
Ahu filters clean(dirty at above 150pa), confirm manometer gauge fitted and operational
-
Ensure all belts and guards are tight to evaporator fan
-
Confirm evaporator condition ( clean/dirty, fin damage or corrosion)
-
Ahu 1 air on evap coil temp
-
Ahu 1 air off evap coil temp
-
Ahu 2 air on evap coil temp
-
Ahu 2 air off evap coil temp
-
Has main ahu shaft bearings and motor bearings been lubricated
-
Door seal's/handles operational
-
Ensure no air leaks present
-
Ahu floor clear of water and corrosion
-
Pipe work lagging and insulation satisfatory
-
Pipe work supports and brackets satisfatory(no vibration evident)
-
Damper operational including fire,return air and smoke (ensure accessible, lubricated and tagged if required)
Split Systems (SS)
-
Split System Equipment Inspected on this Visit?
-
Amenities ac operational
-
Cash office ac operational
-
General office ac operational
-
Managers office ac operational
-
Staff training ac operational
-
Systems office ac operational
-
Filters cleaned on all split systems and return air grills
Air Cooled Condenser Units (ACC)
-
Air Cooled Condenser Units Inspected on this Visit?
-
Roof penetrations ok and not leaking
-
Rooftop package units inspected
Exhaust Fans (EF)
-
Exhaust Fan equipment inspected on this visit?
-
Stockroom exhaust operational
-
Plantroom exhaust operational
-
Toilet exhaust operational
-
Bakery hood operational (no grease buildup)
-
Chicken hood opertational(no grease build up)
-
Cleaners room exhaust fan operational
-
Back dock exhaust fan operational
-
Roof top fresh air supply fan in good condition filters clean
-
Donut exhaut fan hood operational
-
Smoke exhaust fans operational
Main system running information
-
Check switchboard electrical(led's, wiring ducts, visual damage)
-
BMS operational (if fitted)
-
Check main control unit operation ( cpc, innotech, seimens or phasefail)
-
Visual check water cooled condenser and pumps for corrosion(fan operation,pump operation, water leaks)
-
Ambient temperature
-
Ambient humidity
-
Store temperature(NEAR RETURN AIR GRATE)
-
Store humidity (NEAR RETURN AIR GRATE)
-
Refrigerant type
-
Oil type
-
Compressor effiency testing exceptable, unloaders operational
-
Control lines to saftey devices in flexible line not copper
-
Check compressor safeties
-
Compressor 1 pressures
-
Compressor 2 pressures
-
Compressor 3 pressures
-
Compressor 4 pressures
-
Compressor 5 pressures
-
Compressor 6 pressures
-
Compressor 7 pressures
-
Compressor 8 pressures
-
Check operating refrigerant pressures
-
Check compressor(s) and component(s) - observe operation
-
Safety ladders and walk platforms acceptable and available were required
-
Visual inspection of condenser coil(s) - comment on damage/if cleaning required( photos )
-
Check condenser fan blades and rotation
-
Condenser system 1 air on temp
-
Condenser system 1 air off temp
-
Condenser system 2 air on temp
-
Condenser system 2 air off temp
-
Plantroom clean and free of storage items,chemicals ect.
-
Liquid recievers open and charged
-
Liquid level system 1 adequate
-
Liquid level system 2 adequate
-
Liquid level system 3 adequate
-
Liquid level system 4 adequate
-
Liquid line sight glass full on each system to txv
-
Valve caps installed and in good condition, 1/4 bonnets installed on schrader valves
-
Confirm no obvious potential for pipe friction/rubbing
-
Refrigeration gauges integrity(if fitted)
-
Is Compressor operating within limits(no issues with flood back, oil levels ect., unusual noise vibration)
Air distribution, general plant
-
Ensure duct work condition( no physical damage, forklift strike ect)
-
Duct insulation acceptable(no duct sweating or mold issues)
-
Heating elements funtional ( no tripped C/B)
-
Access to heating elements accepatable
-
Plantroom and ahu lighting acceptable
-
Plant area accesable lockable
-
Adequate documentation on site(electrical drawings,manuals, duct layouts)
Findings, Recommendations & Sign-Off
-
Last PM Performed.
Preventative Maintenance Findings
-
Confirm no new equipment issues discovered during this audit?
-
Confirm no other general audit notes or comments?
undefined
-
undefined
-
Add media
Equipment Replacements/Additions
-
Confirm if any equipment has been replaced in last 12 months.
Audit Sign-Off
-
Name
-
signature
-
PHOTO OF EMS COMPLETED