SFG 20 Procedure - HWS Calorifiers (1Y)
-
Check operation, in particular safety controls
-
Check for corrosion, dirt or damage
-
Check Thermostats, pressure sensors, pressure gauges and thermometers for correct operation and settings
-
Shut down primary heat source and lock off
-
Draw off a small quantity of water to remove any sediment
-
Remove strainer, clean and refit
-
Check and record DHWS and heat exchanger temperatures
-
After completion of maintenance, replace any inspection hatches if removed and put calorifier back into operation
-
Repair or renew insulation as necessary
Additional Comments
-
Report of any faults
Safety checks
-
Inspection Completed
-
Area left clean