Information
-
Conducted on
-
Job Number
-
Jobsite Name
-
Type of Work
Are These Items Completed & Up To Date?
-
Project Safety Plan
-
JSA's
-
Crisis Management Plan
-
Project Safety Workbook
-
Tool Box Talks
-
Morning Huddle
Are These General Safety Items Current & Up To Date?
-
Postings (State, Fed, EEOC, Drug, Work Comp)
-
Date Corrected:
-
Safety/MSDS Manual
-
Date Corrected:
-
Emergency Phone Posting (FA/CPR, Map)
-
Date Corrected:
-
OSHA 300 Log (February To April)
-
Date Corrected:
-
First Aid Kit/Eye Wash
-
Date Corrected:
-
Competent Person Inspections
-
Date Corrected:
Housekeeping
-
Trash, Scrap, And Debris Picked-Up
-
Date Corrected:
-
Trailer Clean
-
Date Corrected:
-
Material Stored, Tools/Rigging Organized
-
Date Corrected:
-
Cords And Leads Routed Properly
-
Date Corrected:
-
Stairways, Halls, And Roadways Clear
-
Date Corrected:
-
General Site Conditions (Describe)
-
Date Corrected:
-
Drinking Water
-
Date Corrected:
-
Sanitation (One Toilet Per 20 Workers)
-
Date Corrected:
Personal Protective Equipment
-
Hard Hats
-
Date Corrected:
-
Eye Protection (Glasses/Goggles)
-
Date Corrected:
-
Face Shield (Grinding/Cutting/Welding)
-
Date Corrected:
-
Proper Gloves (Cotton/Leather/Chemical/Kevlar)
-
Date Corrected:
-
Foot Protection
-
Date Corrected:
-
Hearing Protection
-
Date Corrected:
-
Respirators
-
Date Corrected:
-
Proper Attire
-
Date Corrected:
Fall Protection System
-
Harness/Retractable/Positioning Above 6'
-
Date Corrected:
-
Guard Rails Up (At 42"+/-3", Wire Rope Flagged Every 6')
-
Date Corrected:
-
Holes Protected
-
Date Corrected:
-
Leading Edge At 15'
-
Date Corrected:
Fire Protection/Prevention
-
Fire Extinguishers Accessible/Current Within 100' Travel?
-
Date Corrected:
-
Signage of Flammable/Combustible Materials
-
Date Corrected:
-
Signage/Labeling
-
Date Corrected:
-
Fire Watch Required/Used
-
Date Corrected:
Cranes and Forklifts
-
Barricade Up
-
Date Corrected:
-
Daily/Monthly/Annual Inspection Complete
-
Date Corrected:
-
Are Power Lines Further Than 20'?
-
Date Corrected:
-
Set-Up Correctly
-
Date Corrected:
-
Correct Size (Not Over-Loading)
-
Date Corrected:
-
Crane Operator Training (CCO)
-
Date Corrected:
-
Rigging Inspected
-
Date Corrected:
-
Taglines Used
-
Date Corrected:
-
Cribbing In Place
-
Date Corrected:
-
Forklift Training
-
Date Corrected:
Welding and Cutting
-
Cylinders Properly Stored
-
Date Corrected:
-
Flash Arrestors
-
Date Corrected:
-
Hard Hats Under Welding Hoods
-
Date Corrected:
-
Proper PPE Used
-
Date Corrected:
-
Conditions Of Leads
-
Date Corrected:
Access Equipment
-
Extension Ladder (4V:1H, 3' Extension, Secured)
-
Date Corrected:
-
Aerial Lifts
-
Date Corrected:
-
Stairways/Walkways
-
Date Corrected:
Scaffolding
-
Base (Sills/Plates/Jacks/Casters, Secured, Level)
-
Date Corrected:
-
Braces (Installed, Secured, Condition)
-
Date Corrected:
-
Frames (Compatible, Pinned, Condition)
-
Date Corrected:
-
Platform (Complete, Overhang/Secured, Condition)
-
Date Corrected:
-
Access (Integrated Frame, Ladder, Other)
-
Date Corrected:
-
Other (Secured At 4V:1H, Tagged)
-
Date Corrected:
Electrical
-
Panels (Covers In Place)
-
Date Corrected:
-
GFCI (Electrician Weekly Inspection)
-
Date Corrected:
-
Electrical Cords (Condition, Proper Use)
-
Date Corrected:
-
Power Tools
-
Date Corrected:
-
Temporary Lighting
-
Date Corrected:
-
Power Sources/Lines 20' Conductors Away?
-
Date Corrected:
Excavation
-
Spoils 2' From Edge
-
Date Corrected:
-
Access/Egress Ladder Extends At 4' (25' Travel)
-
Date Corrected:
-
Slope, Shoring, & Shielding At 5'
-
Date Corrected:
-
Competent Person
-
Date Corrected:
Additional Comments
Superintendent Signature
-
Add signature
Inspector Signature
-
Add signature