Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Legend
-
Compliant - Completed, no problems found
-
Non-compliant - Completed, problems noted & repairs required
-
Rectified - Completed, problems corrected
-
Incomplete - Unable to perform inspection or additional work to be done.
General
-
Banlaw Job Number:
-
Order Number:
-
Work started
-
Work completed
Inwards Fuel Delivery
-
01-Banlaw FMS (Banlaw BFTE1A, 3632)
-
02-Code Hose / Hoses
-
03-Connection fitting (CAMLOCK 3", MALE)
-
04-Non-return vale (UNKNOWN 3" WAFER)
-
05-Ball valve (SWAN 3" MANUAL BALL)
-
06-Strainer
-
07-Pump (Regent 2000 80SP-177C-2233/V, A71721T132)
-
08-Motor (TECO 7.5KW, 14.3A, 4116092012)
-
09-Pipe work (3")
-
10-Bulk Air eliminator
-
11-Filter
-
12-Flow Meter / Pulser
-
13-Cla-Val Valve
-
14-Pressure Relieve For Thermal Expansion
-
15-Flow switch
-
16-Temperature Probe
-
17-Gate valve
-
18-Actuated N / C Fire Safe Valve
-
19-Overfill Protection Control Unit
-
20-Pressure Relieve For Thermal Expansion
-
Add media
-
Add drawing
Storage Tank
-
01-Diesel Tank (DTE T55KL)
-
02-Water drain N / C (SELF BUNDED)
-
03-Overfill Protection System Level Switch (TANK BOSS BI4000H)
-
04-Tank level sensor
-
05-Temperature sensor
-
06-Pressure / Vacuum Relief Valve
-
07-Tank Vents
-
Add media
-
Add drawing
Fuel Dispensing
-
01-Manual Isolation Valve (UNKNOWN 2" MANUAL BALL)
-
02-Actuated N / C Fire Safe Valve
-
03-Pressure Relieve For Thermal Expansion (SAFETY VALVE L3 45PSI)
-
04-Strainer (LC A2340, 153413)
-
05-Pump (CORKIN CORO VANE PZ10NSID2EE, 286411JL)
-
06-Motor (WEG K21BW22 - 5.5KW)
-
07-Air eliminator (LC A8197, 135534)
-
08-Flow Meter (LC M-10-1)
-
09-Pulser (VEEDER ROOT 767163-305, 13465)
-
10-Mechanical Register (VEEDER ROOT 0788700-064)
-
11-Temperature Probe
-
12-LV Hose Reel (GRACO 1" 237728, J11B)
-
13-HV Hose Reel
-
14-Power Station Transfer Pump (REGENT 508P159T288/D)
-
15-Power Station Transfer Motor (TECO AEHB-UCC2N - 2.2KW, 4.1A)
-
16-Power Station Transfer Isolation Valve (UNKNOWN 2" MANUAL BALL)
-
17-LV Solenoid Authorisation (PROCESS SYSTEMS B55-6-25-1B, G12WAY)
-
18-HV Solenoid Authorisation (PROCESS SYSTEMS B55-8-35-1B, G 1 1/2 2WAY)
-
19-LV Nozzle (ZVA 25)
-
20-HV Nozzle
-
21-Day Tank Power Station (2 x 2000litre)
-
22-Absorb and Roughing Filter
-
23-Polishing Filter
-
24-Actuated N / C Valve
-
25-Pressure Relieve For Thermal Expansion
-
26-Loading Arm
-
27-Breakout Point
-
28-Break-away Valve
-
29-Flexible Wire Braided fuel Hose & Data Wire Assembly
-
30-Swivel & Inlet Probe
-
31-Banlaw High Flow Nozzle
-
32-Banlaw Nozzle Holster
-
Add media
-
Add drawing
Issues & remarks
-
Inspection Comments
-
Recommendations
Signoff
-
Inspected by
-
Inspected by
-
Inspected by
-
Approved by
-
NOTE: All non-compliant results will followed up by Banlaw Service. Work required will be quoted then submitted for review, approval and scheduling.