Title Page
-
Conducted on
-
Prepared by
-
Job(SITE-for assigning grouped actions)
-
PM Number
-
Address
-
Location Number
-
Foreman
-
Construction Date
-
Circuit Voltage
-
Arrester District
-
Insulation District
-
Corrosion Area
-
Raptor Zone
-
Exempt Equip Install
-
HFRA
-
HFTD
-
Responsibility Area
-
Joint Pole
POLE/FRAMING/MARKING
-
POLE/FRAMING/MARKING
-
CCSC-Are visibility strips installed at 3-4-5 ft from traveled surface and covering all traffic approaches such as driveways within 6ft?
-
CCSC-High Voltage signs installed per standard?
-
CCSC-Is bottom pole step 8-1/2 ft or more above ground or climbable/accessible surface, if present.
-
CCSC-Are bolt covers installed over bolts in the climbing space which are below the pole top, bonded to, or used for dead end hardware?
-
CCSC-Is Pole line hardware not loose and installed per standard(spring clips with round washer, etc.)
-
CCSC-Assessed 3rd party facilities and notification was submitted if foreign attachments are present on pole.
-
POLE-Is pole hole backfilled & tamped sufficiently without leaving low spots/sink holes & excessive amounts of gravel/dirt?
-
POLE-Is the belly button at the proper height based on required setting depth?
-
POLE-Is pole tag installed with 4 nails/screws between 6-7ft?
-
POLE-Is current year date nail installed ~ 6ft?
-
POLE-Is the pole straight? (Leaning less than 10% of above ground pole height)
-
POLE-Is the pole set in “rock”?
-
POLE-Was a preservative wrap installed?
-
POLE-Is top through bore hole between 12-24”
-
POLE-Was a preservative wrap installed?
-
POLE-Is pole located within a HFTD/HFRA?
-
POLE-Is location truck accessible year round?
-
POLE-Was an intumescent pole installed?
-
POLE-Is intumescent wrap free of damage larger than a tennis ball?
-
POLE-Split bolt installed? (Composite arm at pole top, triangular dead end, guy stub pole if pole eye plate used)
-
POLE-Raptor Zone - Correct framing or covers used?
-
POLE-Is 6ft neutral space maintained on new JT poles?
-
POLE-Was old pole ground removed from abandoned JT poles?
-
FRAMING-If span length exceeds 600ft(475ft for #6 & #4CU), was Long Span framing used? 10'6" D.E. arm w/ 4ft spacing.
-
FRAMING-Is the climbing space free of all obstructions?
GUYS
-
GUYS
-
CCSC-Are markers installed on all down guys? ( Viz strips if required)
-
CCSC-No broken, slack or missing guy wires? ALL guys must be checked.
-
CCSC-Are all preforms completed with no guy wire ends exposed?
-
CCSC-Do the guy insulators maintain 3" of clearance from each other?
-
CCSC-Trees/vegetation are not grounding guy wire above guy insulator?
-
CCSC-Is there 3" of clearance from Comm, Secondary and/or Services?
-
CCSC-Guy insulators are 8ft or more above ground?
-
CCSC-Check/removed excessive strain and abrasion caused by vegetation on guy wires.
-
GUYS-Are all of the guy insulators out of barrel of proximity?
-
GUYS-Are all of the span guy insulator between 6-9ft from pole?
-
GUYS-Guys clamped together or additional guy guard installed if angle between guys is too great?
-
GUYS-Guys pulling in-line on composite arm guy fixture?
-
GUYS-No more that 2-3/8" or 1-7/16" down guys installed on composite arm fixture?
-
GUYS-Guy attachments installed a minimum of 12" apart on pole?
-
GUYS-No more than two guys, having a vertical separation of 18" or less, were installed in any 4 ft section of climbing space
-
GUYS-Proper attachments and correctly sized bolts/curve "X" washers used on down guys? - Pole eye plate w/ 3/4" bolt/washers for 7/16"(25m), 3/4" bolt/washer for 3/8"(20m), 5/8" bolt/washer for 5/16"(16m) & 7/32"(10m)
-
GUYS-No mixing of alumaweld & galvanized material
-
GUYS-Guys spliced correctly?
-
GUYS-SEVERE CORROSION AREA
-
GUYS-Were Alumaweld preforms and guy wire used?
-
GUYS-No mixing of galvanized and alumaweld material? Ex: 7/32 galvanized splice on 5M3.
-
GUYS-SIDEWALK GUY
-
GUYS-Is the queens post length roughly even with the anchor lead?
-
GUYS-Is the queens post height a minimum of 8ft 6in from surface of sidewalk/ground?
-
GUYS-Is the guy wire securely clamped on the end fitting with only one guy per groove?
ANCHORS
-
ANCHORS
-
CCSC-Are anchor rods to standard? No more that 36" for high for PISA and 12" for non-PISA.
-
CCSC-Anchors are not buried?
-
ANCHORS-Anchor tag installed?
-
ANCHORS-Tag trimmed correctly?
-
ANCHORS-Anchor was installed at correct lead or redlined with approval?
-
ANCHORS-Anchor was installed at minimum distance from existing anchors?
-
ANCHORS-1 preform per groove? No cross grooved preforms?
CROSSARMS/ INSULATORS/ BONDING
-
CROSSARMS/ INSULATORS/ BONDING
-
CROSSARMS-Correctly sized crossarms were installed to accommodate the required climbing space?
-
CROSSARMS-Were money clips and round washers installed?
-
CROSSARMS-Total line angle is less than 45 degrees both horizontally and/or vertically on dead end arms where the conductor is NOT larger than 1/0 ACSR tree wire?
-
CROSSARMS-Were 4x4 curved 'X' washers used on DDE & slack span crossarms?
-
CROSSARMS-Is all of the bonded hardware removed from the climbing space?
-
CROSSARMS-UAB installed under crossarm with maximum 24" strap spacing and 3" clearance from end of conduit?
-
INSULATORS-Angle washers installed on all insulators supporting line conductors and field installed dead ends?
-
INSULATORS-Total line angle is less than the maximum rating for the pins & insulators used?
-
INSULATORS-Correct size and type insulators were installed based on voltage & insulation district? (Ex: HPI 35-02 should be used on 12kv in A and AA insulation districts.)
-
BONDING-Bonding installed as required?
-
BONDING-Bond wire maintains 1.5” of clearance from unassociated hardware?
-
BONDING-Bond wire avoids open insulator holes?
-
BONDING-Bond wire grounding provision (3x3 square) provided on double dead ends, 12-21kV.
CONDUCTORS / CONNECTIONS
-
CONDUCTORS / CONNECTIONS
-
CCSC-Are G.O. 95 clearances maintained above ground and structures throughout the entire span?
-
CCSC-Are G.O. 95 clearances maintained throughout the entire span to other conductors, guys and equipment (poles, crossarms, etc)?
-
CCSC-Connectors installed per standard (type, conductor cleaned, inhibitor applied, correct dies, # of crimps?
-
CCSC-No vegetation is within 18" of primary conductors?
-
CCSC-HFTD/SRA-No vegetation is within 4ft of primary conductors? EC tag created if veg is within 4ft?
-
CCSC-Check/removed excessive strain and abrasion cause by vegetation on secondary conductors.
-
LINE JUMPERS-Correct size and type installed?
-
LINE JUMPERS-Incidental wiring clearance maintained?
-
CONNECTIONS-was the proper size/type used? Ex: CU connectors for pin terminals when connected to copper, AL hot line clamp used on AL conductor.
-
CONNECTIONS-do the conductors look like they were cleaned & greased properly?
-
CONNECTIONS-correct # of presses?
-
CONNECTIONS-does it look like the correct dies were used?
-
CONNECTIONS-tap guard installed under hotline clamps?
-
CONNECTIONS-Are all covered to covered connections sealed properly?
-
CONNECTIONS-No connections were installed under dead end or line covers?
-
CONDUCTORS-covered conductors shaped to prevent water intrusion? Ex:drip loops, UAB neutral @ svc neutral connection pointed sideways or down?
-
CONDUCTORS-Are all supply conductors free of damage in both directions from work location?
-
CONDUCTORS-Hand ties installed correctly? Ex: the ends of bare ties above 6500v are touching conductor, coated ties ends are not touching conductor. Conductor angle if top tied <3°
-
CONDUCTORS-Armor rods installed if required?
-
CONDUCTORS-Preform ties installed correctly? Line angle on top tie <10? Rubber baby buggy bumpers installed?
-
CONDUCTORS-copper angles tied in using two ties?
-
CONDUCTORS-Vibration dampers required?
-
CONDUCTORS-Were dampers installed?
-
VIBRATION DAMPERS-1 spiral dampener installed on #4 & #2 ACSR on spans 300-800ft or 2 installed on spans over 800ft.
-
VIBRATION DAMPERS-Installed at correct distance from support?
-
VIBRATION DAMPERS-Not installed over any sleeves?
-
CONDUCTORS-TENSION SPLICES
-
TENSION SPLICES-Was the correct size/type of sleeve used?
-
TENSION SPLICES-Installed no closer than 2 ft from support?
-
TENSION SPLICES-Conductor prepped?
-
TENSION SPLICES-Correct number of presses?
-
TENSION SPLICES-Splice is straight? No excessive curving?
-
TENSION SPLICES-# of splices in each conductor does not exceed 2 per span?
-
TENSION SPLICES-Splices not installed closer together than 50ft?
-
CONDUCTORS-SLACK SPAN
-
SLACK SPAN-Correct type of clamp top shoe used? Steel for CU & AL for AL?
-
SLACK SPAN-If slack span is flat framed, was the center phase offset/staggered from adjacent pole?
-
SLACK SPAN-RIV clips installed on clamp top shoes or on all pin points if poly bell and shoes were used?
-
SLACK SPAN-No wedge shoes or automatic splices were used in slack span?
-
SLACK SPAN-SEVERE CORROSION AREA-No preform slack span ties used?
SERVICES
-
SERVICES
-
CCSC-Proper vertical & radial clearances maintained above ground, street and from comm, etc?
-
CCSC-Checked/removed excessive strain and abrasion against vegetation?
-
CCSC-Assessed 3rd party facilities and notification was submitted if foreign attachments are present on weatherhead.
-
SERVICES-Zip ties used? No tape.
-
SERVICES-Drips loops or covered conductor turned downward, as needed, at pole and customer attachment?
-
SERVICES-Connections sealed properly at pole and customer attachement?
-
SERVICES-No piercing connectors were used at weatherhead?
-
SERVICES-Severe Corrosion Area - H-Taps used at weatherhead? No insulinks.
-
SERVICES-If customer premises has a metal roof, does the service maintain 12” of clearance from the roof?
-
SERVICES-If periscope extension was installed, total height does not exceed 30" if service can be struck by tree limb.
-
SERVICES-Was a breakaway kit installed if it’s possible for the service to be knocked down by a tree or tree limb?
-
SVC BREAKAWAY-Is neutral tail 6-10” longer than hot legs?
-
SVC BREAKAWAY-Are all covers installed, including one on the neutral with open end pointing down?
-
SVC BREAKAWAY-Breakaway NOT installed on pole with open wire or from midspan attachments or if the service is crossing a public road?
-
SERVICES-Mid-span service?
-
MID SPAN SVCS-Proper mid-span attachment used? Insulated clamp for open wire/aluminum butterfly for TAC.
-
MID SPAN SVCS-Aerial Cable: no more than 2 services per butterfly.
-
MID SPAN SVCS-Open-wire: 1.5 turns of service leg around conductor before connection?
-
MID SPAN SVCS-Does guy messenger have proper vertical clearance below open wire conductors?
-
MID SPAN SVCS-Does guy messenger have proper vertical clearance above communication?
AERIAL CABLE (ACSR/AWAC)
-
AERIAL CABLE (ACSR/AWAC)
-
TAC-4x4 washer used on Aerial Cable dead ends?
-
TAC-Correct automatic dead end shoes with clevis installed? AWAC on AWAC/ACSR on ACSR.
-
TAC-4 skirt insulator used on dead end?
-
TAC-No midspan drops installed on slack spans?
-
TAC-No midspan drops installed on ACSR >36” from pole
-
TAC-3ft minimum clearance between TAC and communication maintained through entire span?
-
TAC-Preformed dead ends used on slack spans?
-
TAC-Correct bracket/clevis installed?
-
TAC-Washers installed behind clevis/extension brackets?
-
TAC-Properly sized preform tie used and rubber baby buggy bumper installed?
RISERS
-
RISERS
-
CCSC-All lags were installed in first section of molding?
-
RISERS-Riser tag installed ~ 9ft?
-
RISERS-Riser tag punched out correctly?
-
RISERS-Riser molding installed per standard with no gaps > 1/4" and no joints overlapped by more than 1"?
-
RISERS-Preachers collar installed?
-
RISERS-Bare pole ground wire isolated from kellums at top of molding?
-
RISERS-U guard length no less then 30"?
-
RISERS-Riser lag spacing above 10ft does not exceed maximum of 36"
-
RISERS-Mini lags not overdriven?
-
RISERS-Reducer boot installed per standard?
-
RISERS-Minimum clearance between top of riser and next conductor level maintained?
-
RISERS-Pin terminals installed as required?
-
RISERS-Are pin terminals sealed? (mastic and tape, no cold shrink allowed)
-
RISERS-Pin terminals are not bent within 1" of barrel?
TRANSFORMER & TX CUTOUTS
-
TRANSFORMER & TX CUTOUTS
-
TRANSFORMER-Was proper size/type lead wire used?
-
TRANSFORMER-Money clip installed on bottom bolt?
-
TRANSFORMER-Bolt covers installed?
-
TRANSFORMER-Proper spacing from conductors levels, above & below?
-
TRANSFORMER-Covered leads maintain minimum 1” clearance from TX case?
-
TRANSFORMER-Are bushing covers installed as required and to standard? (Ex: snapped closed, not installed too far down on bushing)
-
TRANSFORMER-Leads have drip loops as needed up to 250cu. Larger leads have mastic and tape installed?
-
TRANSFORMER-was red shipping cap removed?
-
TX CUTOUTS-HFTD/HFRA/SRA/FRA?
-
TX CUTOUTS-Exempt cutouts & fuses installed?
-
TX CUTOUTS-Single PT-65 on 4kv(L-N)?
-
TX CUTOUTS-Arrester district 2 & last TX on the tap?
-
TX CUTOUTS-Arresters installed?
-
TX ARRESTERS-SPU tails have enough slack to operate properly?
-
TX ARRESTERS-Arresters have animal covers/guards installed.
-
TX ARRESTERS-Arresters properly sized?
-
TX ARRESTERS-#4 sol cu used?
-
TX ARRESTERS-Second ground run installed?
-
TX ARRESTERS-Maintain 6” clearance from transformer ground?
-
TX ARRESTERS-Does the ground have a 4-5" bare spot below arresters?
POLE GROUND
-
POLE GROUND
-
CCSC-Ground rod(s) & wire not exposed?
-
POLE GROUND-Was Proof Positive wire used?
-
POLE GROUND-free of damage or, if damaged, was it repaired?
-
POLE GROUND-Correct staple spacing?
-
POLE GROUND-Staples not overdriven?
-
POLE GROUND-not installed in climbing space without wood molding?
-
POLE GROUND-maintains 1.5” of clearance from unassociated hardware?
LINE CUTOUTS/FUSES (INCLUDES PRIMARY RISERS)
-
RISER or LINE CUTOUTS/FUSES
-
Switch numbers installed as required?
-
Switch numbers correct?
-
Phase numbers installed on switch arm or pole?
-
Bolt covers installed as needed?
-
Was proper size/type lead wire used based on load side conductor size?
-
Step bolt installed as fuse holder in correct location?
-
Cutout covers installed?
-
Proper clearance between cutouts?
-
Incidental wiring clearances maintained?
-
Grounding studs installed in the bottom of the riser cutouts?
-
Proper vertical clearance between cutouts and next supply level below?
-
Hot line clamps not used to supply more than two transformers OR a primary riser?
-
Was a 10ft 6in arm installed if 3 Line and 2 Tx cutouts were installed on arm?
-
Arrester District 1 or 2 & Pri Riser?
-
Arresters installed on primary riser?
-
Arrester grounds connected to concentric neutrals?
-
SPU tails have enough slack to operate properly?
-
Arresters have animal covers/guards installed.
-
Arresters properly sized?
-
#4 sol cu used?
-
HFTD/HFRA/SRA/FRA: Exempt cutouts & fuses installed?
-
If non exempt equipment was intentionally installed or transferred from an existing pole was the silver PG&E veg tag transferred from the old pole to the new pole? Example-Pri Risers w/solid blade cutouts.
'PN' or 'CN'
-
'PN' or 'CN'
-
PN signs installed per standards?
-
Compression connectors used on common neutral?
-
PN not interconnected with customer service neutrals.
-
New pole ground installed at CN location, if pole ground was existing on old pole.
-
Pole ground installed on first PN pole from tap point/take off pole.
STREETLIGHT
-
STREETLIGHT
-
STREETLIGHT-Is the correct streetlight number installed at ~ 9ft?
-
STREETLIGHT-Lag bolts installed?
-
STREETLIGHT-Street light head & bracket maintain 12” clearance from services & UAB leads?
-
STREETLIGHT-Street light conduit installed completely out of the climbing space?
-
STREETLIGHT-Conduit strap spacing does not exceed 36"?
900 AMP SWITCH
-
900A SWITCH
-
900A SW-Switch numbers installed as required?
-
900A SW-Switch numbers correct?
-
900A SW-Bolt covers installed as needed when installed below the pole top?
-
900A SW-Was proper size/type lead wire used based on load side conductor size?
-
900A SW-Proper vertical clearance between bottom of switch and next supply level below?
-
900A SW-Upsized 3/4” split bolt with 3.5” curved washers used?
-
900A SW-Post insulators used to support conductor/jumpers?
-
900A SW-Bottom bolt left long for grounding purposes?
-
900A SW-Extension links used on all dead ends?
-
900A SW-TECO plates and trap nuts installed under switch, if visible?
-
900A SW-Alternative construction(DDE) used in raptor zone?
-
900A SW-SEVERE CORROSION AREA-Anderson clamps used for copper jumpers?
-
900A SW-Minimum 2/0 CU jumper size in Anderson clamp?
MISCELLANEOUS
-
CCSC-10ft radial ground clearance provisions addressed on poles with non-exempt equipment? (Ex: if solid blades are present, is a silver PG&E veg tag attached to the pole?)
-
CCSC-OH equipment secured and locked?
-
CCSC-Job site is cleaned and idle hardware is removed.
-
Is property or yard free from damage such as ruts or damaged sprinklers etc?
-
Were all the no park signs picked up?
-
Are there any other items that could result in a go back that aren't listed in other sections? Describe.