Title Page
-
Job # - Name:
-
Architectural Room Name/Number:
-
Common Room Name/Number:
-
Verified By:
-
Conducted on:
Checklist:
-
All cable labels applied as per project drawings:<br>-verify rack, in room devices/equipment, wall plate/table interfaces, user cables
-
All cable terminations are finished:<br>-verify RJ45 boots in place, heat shrink applied, Phoenix connector strain relief in place
-
All cable management is complete, dressed and clean:<br> -verify behind displays, under tables, equipment racks
-
All cable umbilicals and service loops are dressed (Velcro strapping or Snakeskin)
-
All rack mounted equipment has proper air flow:<br>-verify enclosed racks have forced air movement or fans
-
All beauty plates or blanks are installed:<br>-verify rack blanks are installed and any wall or table inputs are finished with blanks or decora plates
-
All ceiling mounted equipment is properly secured, and all safety harnesses are in place<br>-photograph above ceiling structures
-
All wall mounted equipment is properly secured and any lock out measures are applied<br>-photograph mounts (with any behind display devices in place) before mounting displays
-
All mounted devices are level:<br> - Displays, Cameras, Touch Panels, Room Schedulers
-
All speaker grill orientation is uniform
-
Audio output is balanced and even throughout the room (checking speaker taps)
-
System is tested and functioning as per the Scope of Work
-
The room is clean<br> - verify garbage removed, floors vacuumed, protective plastics are removed, and installed equipment is wiped down
-
All deliverables (remotes, keys, etc.) and end-user cables are in place:<br>- photograph deliverables in their final locations
-
Is this room ready to be certified?
Exceptions
-
List any known exceptions (examples, backordered equipment, missing cables, waiting on OFE, etc.)