Title Page
-
Job # - Name:
-
Room Name:
-
Certified By:
-
Conducted on:
Checklist:
-
ALL labels applied: - Rack - Gear Box - Field
-
Heat shrink applied to all exposed wiring.
-
RJ45 boots installed.
-
Phoenix connector strain relief.
-
Rack fan installed in credenza.
-
Speaker taps set.
-
Speaker grill orientation correct.
-
Amp gain set.
-
Beauty plates installed: - Decora plates for input plates - Blank plates for unused gang boxes
-
Set display settings. If allowed by display. - Auto power off (off) - Energy saver (off) - Unused inputs disabled - Inputs labeled - Quick start (enabled)
-
Level all mounted devices: - Displays - Cameras - Touch Panels - Room Schedulers
-
Cable management: - Behind displays - Under tables - Gear boxes
-
Video/Audio signal flow been tested.
-
Test all room functions.
-
Clean space: - Remove all garbage - Vacuum up all debris - Remove protective plastic from all devices - Wipe down displays
-
End-user cables in place.
-
Have the display/camera remotes been left out?
-
Where are they stored?
-
Is there a Final Room name and or number available?
-
Input that information here.
-
Has all gear been configured? (IP addresses, room name, local time, etc)
-
Is this room ready to be certified?