1. Information
-
Site conducted
-
Audit Title
-
Conducted on
-
Prepared by
Dynamic Risk Assessment
Dynamic Risk Assessment (to be completed before all works)
-
Have you been inducted into the site and have a copy with you/ available electronically (if you have not had an online induction)?
-
Stop works and inform your line manager, you must have an induction for the site.
Site Security.
-
Have you informed security that you are accessing
- Yes
- No
- N/A
-
Is the site free from animals/ Vermin ?
Are you lone working? (if no then select N/A in the below question)
-
Have you activated your lone working device or procedure?
Does site access & egress present any additional safety concerns not listed on the site RA?
-
Such as: Slip, Trip or Fall risks?
1. Management
Management:
-
Photo of the sites gate and fence signage and H&S billboard sign.
-
Full Address and postcode (tap to add Gps location): Include QR scan screenshot as media in below box.
-
1.01 Health and Safety Law Poster displayed with contact details?
-
1.02 Induction registry available?
-
1.03 Signing in and out book available?
-
1.04 From a visual inspection is the earthing suitable (bonding & Labelling)?
-
1.05 Suitable PPE is in use?
-
1.06 Lone working policy available?
-
1.07 Toilet or indication of the nearest public facilities are available?
-
1.08 Is the site completely fenced?
-
1.09 Is the fence in good condition?
-
1.10 Are the perimeter gates locked and the are locks operational?
-
1.11 "COSHH Assessment, Safety Data Sheet and RA is available? <br>(If applicable)"?
-
1.12 Is there adequate lighting available for the site area min 10 Lux?
-
1.13 Access tracks from the main road to the site are in a condition to drive safely?
-
1.14 Insurance displayed and in date?
-
1.15 Alcohol and Drugs Policy displayed?
-
1.16 Site Safety and Environmental rules displayed?
-
1.17 Construction Phase Plan is available (and signed)?
-
1.18 Evidence of distribution of the CPP to other Contractors?
-
1.19 Evidence workforce involvement?<br>
-
1.20 Evidence of utility surveys?
-
1.21 Evidence of Plant and Equipment register?
-
1.22 Evidence of an English speaker per team?
-
1.23 Are overhead HV cables/Power-lines included in the site Risk Assessment?
-
1.24 The underground utilities box covers on the floor are in good state?
-
1.25 H&S Policy displayed, signed and in date?
-
1.26 F10 Displayed (if applicable)?
-
1.27 All workforce trained and competent for the roles being undertaken?
-
1.28 Evidence of competency checks for contractors?
-
1.29 Evidence of CCTV covering the assets?
2. Distribution boards and Charger Units
-
2.01 Are the DB locked and secured?
-
2.02 Have IR checks and records been undertaken for the existing DBs to ensure there are no HOT SPOTS
-
2.03 Are all the cables inside the Distribution Board labelled correctly from a visual perspective?
-
2.04 Are the DBs showing signs of damage (internal or external)?
-
2.05 Signs of rodents inside the DBs or building containing the DB (where applicable)
-
2.06 Are the Charger Units locked and secured?
-
2.07 Are all the cables inside the Units labelled correctly from a visual perspective?
-
2.08 Are the Units showing signs of damage or corrosion (internal or external)?
3. Inverters & Transformers (where applicable)
-
3.01 Warning signage displayed on the buildings?
-
3.02 If SF6 gas is present a warning sign is displayed? (If applicable)
-
3.03 Signs of corrosion inside the buildings?
-
3.04 Signs of damp inside the buildings?
-
3.05 Signs of rodents inside the buildings?
-
3.06 Signs of bird droppings inside the buildings?
-
3.07 Signs of water egress inside the buildings?
-
3.08 Tidiness of the area surrounding the buildings?
-
3.09 Heating and ventilation serviceable?
-
3.10 The emergency buttons are installed outside the buildings and protected (IP 65)?
-
3.11 Is the building tidy?
-
3.12 In the transformers room the circuit breakers are locked with a padlock?
-
3.13 Visually, are the transformers installed in a bounded area (with an in-date filter if TX is outdoors)
4. Customer substation (where applicable)
-
4.0 Warning signage displayed on the building?
-
4.01 If SF6 gas is present a warning sign is displayed? (If applicable)
-
4.02 Signs of corrosion inside the buildings?
-
4.03 Signs of damp inside the buildings?
-
4.04 Signs of rodents inside the buildings?
-
4.05 Signs of bird droppings inside the buildings?
-
4.06 Signs of water egress inside the buildings?
-
4.07 Is the building tidy?
-
4.08 Heating and ventilation serviceable?
-
4.09 The emergency buttons are installed outside the buildings and protected (IP 65)?
-
4.10 In the transformers room the circuit breakers are locked with a padlock?
5. Monitoring Room (where applicable)
-
5.01 Warning signage displayed on the building?
-
5.02 Signs of corrosion inside the buildings?
-
5.03 Signs of damp inside the buildings?
-
5.04 Signs of rodents inside the buildings?
-
5.05 Signs of bird droppings inside the buildings?
-
5.06 Signs of water egress inside the buildings?
-
5.07 Is the building tidy?
6. Environment / Maintenance
-
6.01 Are COSHH materials stored correctly?
-
6.02 Evidence of spill kits, and drip trays (where applicable)
-
6.03 Evidence of waste segregation
-
6.04 Evidence of waste transfer notes
-
6.05 Evidence of licenced waste management centre
-
6.06 Evidence of recycling/ re-use of meterials?
7. Electrical Work / Electricity
-
7.01 Are GS6 goalposts in place (If applicable)
-
7.02 Evidence of installation certificate of generators with an output in excess of 10kVa
-
7.03 Evidence of installation certificate (containers) EICR
-
7.04 Evidence of electrical design drawings
-
7.05 Evidence of PAT Test (if applicable)
-
7.06 Evidence of tools using 110v or less
-
7.07 Switchgear protected from adverse environmental conditions and closed
-
7.08 Distribution cables located where they are not likely to be damaged,
-
7.09 Is the HV Contractor named - with emergency contact details?
-
7.10 Are the operatives undertaking the work competent / trained?
-
7.11 RAMS are available and signed off by the workforce
-
7.12 Are there method statements / work instructions available?
-
7.13 Is a Permit to Work available and correctly filled (if applicable)?
-
7.14 Is there a copy of the Electrical Safety Rules (ESRs) for the contractor available?
-
7.15 Has electrical test equipment been calibrated and have an in-date certificate?
-
7.16 Appropriate electrical isolations in place?
-
7.17 Are appointed persons locks in place on Control Cabinets etc.?
-
7.18 Are Control Panels Locked off before electrical work commences (LOTO)?
-
7.19 Quell-fire installed with no points for rodents ingress.
-
7.20 Where any cables are on the surface are barriers in place with adequate signage and mentioned on the site Risk Assessment)?
8. Fire & Emergency
-
8.01 Fire and Emergency procedure available?
-
8.02 Fire and Emergency plant layout displayed?
-
8.03 Site Emergency contacts displayed and up to date?
-
8.04 "Fire & Emergency signage displayed? <br>(i.e extinguishers, muster point, FA box, etc.)"
-
8.05 Fire extinguishers commissioned?
-
8.06 Fire extinguishers of the correct type?
-
8.07 Fire extinguishers labels in English?
-
8.08 Fire extinguishers maintenance up to date?
-
8.09 Inside the buildings the emergency lights are working (if applicable)?
-
8.10 First Aid box 'readily' available?
-
8.11 Are combustible materials stored away from potential ignition sources?
-
8.12 No Smoking signs posted and enforced where needed?
-
8.13 Are operatives trained in the use of fire extinguishers?
-
8.14 Sufficient number of first aiders (if applicable)?
-
8.15 Evidence of sufficient means to raise the alarm?
-
8.16 Fire Risk Assessment available (this can be an electronic version)?
9. Quality
-
9.1 Has everything been installed according to the design?
-
9.2 Are there any signs of corrosion?
-
9.3 Is there any signs of water ingress?
-
9.4 Are all the work surface areas level and free from trip hazards?
-
9.5 Are all the emergency switching/ devices in working order?
-
9.6 Are there any issues with the design/s (including safety control measures for working safely)?
-
9.7 Has adequate protection for the assets been installed?
-
9.8 Has adequate safe segregation of people and moving traffic been installed?
-
9.9 Is there safe access and egress to all areas such as substations and inverters?