1. Information

  • Site conducted

  • Audit Title

  • Conducted on

  • Prepared by

Dynamic Risk Assessment

Dynamic Risk Assessment (to be completed before all works)

  • Have you been inducted into the site and have a copy with you/ available electronically (if you have not had an online induction)?

  • Stop works and inform your line manager, you must have an induction for the site.

Site Security.

  • Have you informed security that you are accessing

  • Is the site free from animals/ Vermin ?

Are you lone working? (if no then select N/A in the below question)

  • Have you activated your lone working device or procedure?

Does site access & egress present any additional safety concerns not listed on the site RA?

  • Such as: Slip, Trip or Fall risks?

1. Management

Management:

  • Photo of the sites gate and fence signage and H&S billboard sign.

  • Full Address and postcode (tap to add Gps location): Include QR scan screenshot as media in below box.
  • 1.01 Health and Safety Law Poster displayed with contact details?

  • 1.02 Induction registry available?

  • 1.03 Signing in and out book available?

  • 1.04 From a visual inspection is the earthing suitable (bonding & Labelling)?

  • 1.05 Suitable PPE is in use?

  • 1.06 Lone working policy available?

  • 1.07 Toilet or indication of the nearest public facilities are available?

  • 1.08 Is the site completely fenced?

  • 1.09 Is the fence in good condition?

  • 1.10 Are the perimeter gates locked and the are locks operational?

  • 1.11 "COSHH Assessment, Safety Data Sheet and RA is available? <br>(If applicable)"?

  • 1.12 Is there adequate lighting available for the site area min 10 Lux?

  • 1.13 Access tracks from the main road to the site are in a condition to drive safely?

  • 1.14 Insurance displayed and in date?

  • 1.15 Alcohol and Drugs Policy displayed?

  • 1.16 Site Safety and Environmental rules displayed?

  • 1.17 Construction Phase Plan is available (and signed)?

  • 1.18 Evidence of distribution of the CPP to other Contractors?

  • 1.19 Evidence workforce involvement?<br>

  • 1.20 Evidence of utility surveys?

  • 1.21 Evidence of Plant and Equipment register?

  • 1.22 Evidence of an English speaker per team?

  • 1.23 Are overhead HV cables/Power-lines included in the site Risk Assessment?

  • 1.24 The underground utilities box covers on the floor are in good state?

  • 1.25 H&S Policy displayed, signed and in date?

  • 1.26 F10 Displayed (if applicable)?

  • 1.27 All workforce trained and competent for the roles being undertaken?

  • 1.28 Evidence of competency checks for contractors?

  • 1.29 Evidence of CCTV covering the assets?

2. Distribution boards and Charger Units

  • 2.01 Are the DB locked and secured?

  • 2.02 Have IR checks and records been undertaken for the existing DBs to ensure there are no HOT SPOTS

  • 2.03 Are all the cables inside the Distribution Board labelled correctly from a visual perspective?

  • 2.04 Are the DBs showing signs of damage (internal or external)?

  • 2.05 Signs of rodents inside the DBs or building containing the DB (where applicable)

  • 2.06 Are the Charger Units locked and secured?

  • 2.07 Are all the cables inside the Units labelled correctly from a visual perspective?

  • 2.08 Are the Units showing signs of damage or corrosion (internal or external)?

3. Inverters & Transformers (where applicable)

  • 3.01 Warning signage displayed on the buildings?

  • 3.02 If SF6 gas is present a warning sign is displayed? (If applicable)

  • 3.03 Signs of corrosion inside the buildings?

  • 3.04 Signs of damp inside the buildings?

  • 3.05 Signs of rodents inside the buildings?

  • 3.06 Signs of bird droppings inside the buildings?

  • 3.07 Signs of water egress inside the buildings?

  • 3.08 Tidiness of the area surrounding the buildings?

  • 3.09 Heating and ventilation serviceable?

  • 3.10 The emergency buttons are installed outside the buildings and protected (IP 65)?

  • 3.11 Is the building tidy?

  • 3.12 In the transformers room the circuit breakers are locked with a padlock?

  • 3.13 Visually, are the transformers installed in a bounded area (with an in-date filter if TX is outdoors)

4. Customer substation (where applicable)

  • 4.0 Warning signage displayed on the building?

  • 4.01 If SF6 gas is present a warning sign is displayed? (If applicable)

  • 4.02 Signs of corrosion inside the buildings?

  • 4.03 Signs of damp inside the buildings?

  • 4.04 Signs of rodents inside the buildings?

  • 4.05 Signs of bird droppings inside the buildings?

  • 4.06 Signs of water egress inside the buildings?

  • 4.07 Is the building tidy?

  • 4.08 Heating and ventilation serviceable?

  • 4.09 The emergency buttons are installed outside the buildings and protected (IP 65)?

  • 4.10 In the transformers room the circuit breakers are locked with a padlock?

5. Monitoring Room (where applicable)

  • 5.01 Warning signage displayed on the building?

  • 5.02 Signs of corrosion inside the buildings?

  • 5.03 Signs of damp inside the buildings?

  • 5.04 Signs of rodents inside the buildings?

  • 5.05 Signs of bird droppings inside the buildings?

  • 5.06 Signs of water egress inside the buildings?

  • 5.07 Is the building tidy?

6. Environment / Maintenance

  • 6.01 Are COSHH materials stored correctly?

  • 6.02 Evidence of spill kits, and drip trays (where applicable)

  • 6.03 Evidence of waste segregation

  • 6.04 Evidence of waste transfer notes

  • 6.05 Evidence of licenced waste management centre

  • 6.06 Evidence of recycling/ re-use of meterials?

7. Electrical Work / Electricity

  • 7.01 Are GS6 goalposts in place (If applicable)

  • 7.02 Evidence of installation certificate of generators with an output in excess of 10kVa

  • 7.03 Evidence of installation certificate (containers) EICR

  • 7.04 Evidence of electrical design drawings

  • 7.05 Evidence of PAT Test (if applicable)

  • 7.06 Evidence of tools using 110v or less

  • 7.07 Switchgear protected from adverse environmental conditions and closed

  • 7.08 Distribution cables located where they are not likely to be damaged,

  • 7.09 Is the HV Contractor named - with emergency contact details?

  • 7.10 Are the operatives undertaking the work competent / trained?

  • 7.11 RAMS are available and signed off by the workforce

  • 7.12 Are there method statements / work instructions available?

  • 7.13 Is a Permit to Work available and correctly filled (if applicable)?

  • 7.14 Is there a copy of the Electrical Safety Rules (ESRs) for the contractor available?

  • 7.15 Has electrical test equipment been calibrated and have an in-date certificate?

  • 7.16 Appropriate electrical isolations in place?

  • 7.17 Are appointed persons locks in place on Control Cabinets etc.?

  • 7.18 Are Control Panels Locked off before electrical work commences (LOTO)?

  • 7.19 Quell-fire installed with no points for rodents ingress.

  • 7.20 Where any cables are on the surface are barriers in place with adequate signage and mentioned on the site Risk Assessment)?

8. Fire & Emergency

  • 8.01 Fire and Emergency procedure available?

  • 8.02 Fire and Emergency plant layout displayed?

  • 8.03 Site Emergency contacts displayed and up to date?

  • 8.04 "Fire & Emergency signage displayed? <br>(i.e extinguishers, muster point, FA box, etc.)"

  • 8.05 Fire extinguishers commissioned?

  • 8.06 Fire extinguishers of the correct type?

  • 8.07 Fire extinguishers labels in English?

  • 8.08 Fire extinguishers maintenance up to date?

  • 8.09 Inside the buildings the emergency lights are working (if applicable)?

  • 8.10 First Aid box 'readily' available?

  • 8.11 Are combustible materials stored away from potential ignition sources?

  • 8.12 No Smoking signs posted and enforced where needed?

  • 8.13 Are operatives trained in the use of fire extinguishers?

  • 8.14 Sufficient number of first aiders (if applicable)?

  • 8.15 Evidence of sufficient means to raise the alarm?

  • 8.16 Fire Risk Assessment available (this can be an electronic version)?

9. Quality

  • 9.1 Has everything been installed according to the design?

  • 9.2 Are there any signs of corrosion?

  • 9.3 Is there any signs of water ingress?

  • 9.4 Are all the work surface areas level and free from trip hazards?

  • 9.5 Are all the emergency switching/ devices in working order?

  • 9.6 Are there any issues with the design/s (including safety control measures for working safely)?

  • 9.7 Has adequate protection for the assets been installed?

  • 9.8 Has adequate safe segregation of people and moving traffic been installed?

  • 9.9 Is there safe access and egress to all areas such as substations and inverters?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.