Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
Project
-
Location
-
Client
VERIFICATION
-
Construction drawings approved for use
-
DRW
-
REV
-
PVC or HDPE
SET OUT
-
Set out by Builder / Surveyor
-
Co-ordination with other trades
EXCAVATION:
-
1. Marked out per drawing
-
2. Excavation to correct depth
PIPE WORK:
-
1. UPVC SN6 Solvent cement joints
-
2. Pipe install as per drawing
-
3. Pipe install min 600mm depth to correct inverts
-
4. Pipe bedded on select aggregate
-
5. All pipework completed in area
-
6. Lay identification / marking tape as required
-
7. Pipe size used
BACKFILL
-
1. 10mm Agg or bedding sand around pipe
-
2. Backfilling trench with dirt
-
3. Compaction of backfill material
TESTING:
-
1. Air Pressure Test
-
2. Hydrostatic Test
-
3. Vacuum Test
-
Inspection (Fair Trading or Other as required)
COMMISSIONING:
-
All pipework pressure checked for leaks
-
All debris flushed from system
-
All air bled from system
-
Trench compactor used
-
Trench compacted in 150mm layers
REINSTATEMENT OF FINISHED SURFACE:
-
1. Grass areas repaired
-
2. Concrete areas repaired
-
3. Asphalt areas repaired
2. Sign Off
-
CHECKED BY:
-
SIGNATURE:
-
DATE:
-
REVIEWED BY:
-
DATE: