Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Setting out as specified (Checked by Sub-Contractor)

  • Setting out as specified (Checked by Ventry)

  • Trench width/depth as specified (Checked by Sub-Contractor)

  • Trench width/depth as specified (Checked by Ventry)

  • Excavation dry and clean (Checked by Sub-Contractor)

  • Excavation dry and clean (Checked by Ventry)

  • Trench supports/protection and access/egress (Checked by Sub-Contractor)

  • Trench supports/protection and access/egress (Checked by Ventry)

  • Pipe bedding complies with specification, being accurately placed as required (Checked by Sub-Contractor)

  • Pipe bedding complied with specification, being accurately placed as required (Checked by Ventry)

  • All pipes and fittings laid to the lines and levels shown on the drawings (Checked by Sub-Contractor)

  • All pipes and fittings laid to the lines and levels shown on the drawings (Checked by Ventry)

  • Absence of hard spots e.g. bricks beneath pipes (Checked by Sub-Contractor)

  • Absence of hard spots e.g. bricks beneath pipes (Checked by Ventry)

  • Manufacturer's instructions being followed, especially with joints (Checked by Sub-Contractor)

  • Manufacturer's instructions being followed, especially with joints (Checked by Ventry)

  • Gradient set as specified with agreed method (Checked by Sub-Contractor)

  • Gradient set as specified with agreed method (Checked by Ventry)

  • Building Control inspection, as required, during preliminary air/water testing of pipes (Checked by Sub-Contractor)

  • Building Control inspection, as required, during preliminary air/water testing of pipes (Checked by Ventry)

  • Air/Water tests carried out as specification prior to backfilling where possible (Checked by Sub-Contractor)

  • Air/Water tests carried out as specification prior to backfilling where possible (Checked by Ventry)

  • Backfill material complies with specification and compaction layers correct (Checked by Sub-Contractor)

  • Backfill material complies with specification and compaction layers correct (Checked by Ventry)

  • Pipes protected against blockage by debris (Checked by Sub-Contractor)

  • Pipes protected against blockage by debris (Checked by Ventry)

  • Final air test (Checked by Sub-Contractor)

  • Final air test (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.