Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Setting out as specified (Checked by Sub-Contractor)
-
Setting out as specified (Checked by Ventry)
-
Trench width/depth as specified (Checked by Sub-Contractor)
-
Trench width/depth as specified (Checked by Ventry)
-
Excavation dry and clean (Checked by Sub-Contractor)
-
Excavation dry and clean (Checked by Ventry)
-
Trench supports/protection and access/egress (Checked by Sub-Contractor)
-
Trench supports/protection and access/egress (Checked by Ventry)
-
Pipe bedding complies with specification, being accurately placed as required (Checked by Sub-Contractor)
-
Pipe bedding complied with specification, being accurately placed as required (Checked by Ventry)
-
All pipes and fittings laid to the lines and levels shown on the drawings (Checked by Sub-Contractor)
-
All pipes and fittings laid to the lines and levels shown on the drawings (Checked by Ventry)
-
Absence of hard spots e.g. bricks beneath pipes (Checked by Sub-Contractor)
-
Absence of hard spots e.g. bricks beneath pipes (Checked by Ventry)
-
Manufacturer's instructions being followed, especially with joints (Checked by Sub-Contractor)
-
Manufacturer's instructions being followed, especially with joints (Checked by Ventry)
-
Gradient set as specified with agreed method (Checked by Sub-Contractor)
-
Gradient set as specified with agreed method (Checked by Ventry)
-
Building Control inspection, as required, during preliminary air/water testing of pipes (Checked by Sub-Contractor)
-
Building Control inspection, as required, during preliminary air/water testing of pipes (Checked by Ventry)
-
Air/Water tests carried out as specification prior to backfilling where possible (Checked by Sub-Contractor)
-
Air/Water tests carried out as specification prior to backfilling where possible (Checked by Ventry)
-
Backfill material complies with specification and compaction layers correct (Checked by Sub-Contractor)
-
Backfill material complies with specification and compaction layers correct (Checked by Ventry)
-
Pipes protected against blockage by debris (Checked by Sub-Contractor)
-
Pipes protected against blockage by debris (Checked by Ventry)
-
Final air test (Checked by Sub-Contractor)
-
Final air test (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: