Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Risk assessment and method statement agreed (Checked by Sub-Contractor)
-
Risk assessment and method statement agreed (Checked by Ventry)
-
Known services (above and below ground surveyed and marked) (Checked by Sub-Contractor)
-
Known services (above and below ground surveyed and marked) (Checked by Ventry)
-
Setting out grids and pile positions recorded (Checked by Sub-Contractor)
-
Setting out grids and pile positions recorded (Checked by Ventry)
-
Suitable access and hard standing for rig constructed (design checked and approved by temporary works engineer) (Checked by Sub-Contractor)
-
Suitable access and hard standing for rig constructed (design checked and approved by temporary works engineer) (Checked by Ventry)
-
Stability of adjacent structures prior to driving to be checked and confirmed as safe (Checked by Sub-Contractor)
-
Stability of adjacent structures prior to driving to be checked and confirmed as safe (Checked by Ventry)
-
Ground levels at pile positions recorded (Checked by Sub-Contractor)
-
Ground levels at pile positions recorded (Checked by Ventry)
-
Pile diameter and pile position when rig set up checked (Checked by Sub-Contractor)
-
Pile diameter and pile position when rig set up is checked (Checked by Ventry)
-
Depth recorded and vertically or rake of rig checked (Checked by Sub-Contractor)
-
Depth recorded and vertically or rake of rig checked (Checked by Ventry)
-
Concrete mix design and/or grade of concrete used correct (Checked by Sub-Contractor)
-
Concrete mix design and/or grade of concrete used correct (Checked by Ventry)
-
Reinforcement (no. of bars, length, diameter, pitch of helical links) correct (Checked by Sub-ontractor)
-
Reinforcement (no. of bars, length, diameter, pitch of helical links) correct (Checked by Ventry)
-
Cage ties, cover blocks, shape of cage prior to installation (Checked by Sub-Contractor)
-
Cage ties, cover blocks, shape of cage prior to installation (Checked by Ventry)
-
Starter bar length when cage is in place checked (Checked by Sub-Contractor)
-
Starter bar length when cage is in place checked (Checked by Ventry)
-
Positive pressure of injected concrete, if possible to record (Checked by Sub-Contractor)
-
Positive pressure of injected concrete, if possible to record (Checked by Ventry)
-
As built pile positions recorded (Checked by Sub-Contractor)
-
As built pile positions recorded (Checked by Ventry)
-
Pile record sheet/daily records/logs completed, and submitted to Ventry/Client (Checked by Sub-Contractor)
-
Pile record sheet/daily records/log completed, and submitted to Ventry/Client (Checked by Ventry)
-
If applicable, top of pile cut off to correct level, top flat and scabbled (Checked by Sub-Contractor)
-
If applicable, top of pile cut off to correct level, top flat and scabbled (Checked by Ventry)
-
Test results and report compiled as per specification (Checked by Sub-Contractor)
-
Test results and report compiled as per specification (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: