Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
Frame Installation
-
Specified frames in specified locations (Checked by Sub-Contractor)
-
Specified frames in specified locations (Checked by Ventry)
-
Specified finishes (Checked by Sub-Contractor)
-
Specified finished (Checked by Ventry)
-
Opening size matches specifications (Checked by Sub-Contractor)
-
Opening size matches specifications (Checked by Ventry)
-
Frame installed on single plane with jambs vertical and plumb, lintel square (Checked by Sub-Contractor)
-
Frame installed on single plane with jambs vertical and plumb, lintel square (Checked by Ventry)
-
Decorate frame and protect (Checked by Sub-Contractor)
-
Decorate frame and protect (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Door Installation
-
Specified doors in specified locations (Checked by Sub-Contractor)
-
Specified doors in specified locations (Checked by Ventry)
-
Intumescent strips where specified (Checked by Sub-Contractor)
-
Intumescent strips where specified (Checked by Ventry)
-
Specified finishes (Checked by Sub-Contractor)
-
Specified finishes (Checked by Ventry)
-
Gaps between doors and frames as specified (Checked by Sub-Contractor)
-
Gaps between doors and frames as specified (Checked by Ventry)
-
Planed door edges sealed in locations where vulnerable to wetting (from weather spillages or floor cleaning etc.) (Checked by Sub-Contractor)
-
Planed door edges sealed in locations where vulnerable to wetting (from weather spillages of floor cleaning etc.) (Checked by Ventry)
-
Correct fit of doors in units (Checked by Sub-Contractor)
-
Correct fit of doors in units (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Ironmongery
-
Type complies with specifications and samples approved by architect (Checked by Sub-Contractor)
-
Type complies with specifications and samples approved by architect (Checked by Ventry)
-
Position (Checked by Sub-Contractor)
-
Position (Checked by Ventry)
-
Finish (Checked by Sub-Contractor)
-
Finish (Checked by Ventry)
-
Operation (Checked by Sub-Contractor)
-
Operation (Checked by Ventry)
-
If key operated, key clearly labelled and kept in a secure key cupboard prior to official use (Checked by Sub-Contractor)
-
If key operated, key clearly labelled and kept in a secure key cupboard prior to official use (Checked by Ventry)
-
Screws for type, size and direction of slot if required (Checked by Sub-Contractor)
-
Screws for type, size and direction of slot if required (Checked by Ventry)
-
Protection removed prior to any finishing's being applied (Checked by Sub-Contractor)
-
Protection removed prior to any finishing's being applied (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Post Installation Tests
-
Check quality of workmanship for: Hinges, Door closing devices/floor springs, Latches, Panic and emergency equipment, Intumescent materials as specified (Checked by Sub-Contractor)
-
Check quality of workmanship for: Hinges, Door closing devices/floor springs, Latches, Panic and emergency equipment, Intumescent materials as specified (Checked by Ventry)
-
Air permeability test (Checked by Sub-Contractor)
-
Air permeability test (Checked by Ventry)
-
Water tightness test (Checked by Sub-Contractor)
-
Water tightness test (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: