Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
Structural Steel Assembly
-
Column erection (Checked by Sub-Contractor)
-
Column erection (Checked by Ventry)
-
Temporary and permanent bracing adequately fixed (Checked by Sub-Contractor)
-
Temporary and permanent bracing adequately fixed (Checked by Ventry)
-
Beams (including joist and purlins) (Checked by Sub-Contractor)
-
Beams (including joist and purlins) (Checked by Sub-Ventry)
-
Installation is on line, level and plumb (Checked by Sub-Contractor)
-
Installation is on line, level and plumb (Checked by Ventry)
-
Securing connections (Checked by Sub-Contractor)
-
Securing connections (Checked by Ventry)
-
Check that all bolts of correct type, in place and tightened properly (Checked by Sub-Contractor)
-
Check that all bolts of correct type, in place and tightened properly (Checked by Ventry)
-
Base plates are grouted (Checked by Sub-Contractor)
-
Base plates are grouted (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence recorded
Final Inspection
-
Critical dimensions of steelwork against drawings (Checked by Sub-Contractor)
-
Critical dimensions of steelwork against drawings (Checked by Ventry)
-
Fire protection (Checked by Sub-Contractor)
-
Fire protection (Checked by Ventry)
-
Finish and/or coatings undamaged and correct thickness, and any making good completed correctly (Checked by Sub-Contractor)
-
Finish and/or coatings undamaged and correct thickness, and any making good completed correctly (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: