Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Environmental conditions appropriate to proceed with installation (Checked by Sub-Contractor)
-
Environmental conditions appropriate to proceed with installation (Checked by Ventry)
-
Mix proportions as per manufacturers recommendations (Checked by Sub-Contractor)
-
Mix proportions as per manufacturers recommendations (Checked by Ventry)
-
Test screed mix as specified (Checked by Sub-Contractor)
-
Test screed mix as specified (Checked by Ventry)
-
Any required reinforcement/insulation installed (Checked by Sub-Contractor)
-
Any required reinforcement/insulation installed (Checked by Ventry)
-
Laying the screed: - Installation temperature as per requirements for mix type, - Curing time as per requirements for mix type (Checked by Sub-Contractor)
-
Laying the screed: - Installation temperature as per requirements for mix type, - Curing time as per requirements for mix type (Checked by Ventry)
-
Screeding compacted as specified as works proceed (Checked by Sub-Contractor)
-
Screeding compacted as specified as works proceed (Checked by Ventry)
-
Finished levels within tolerance (Checked by Sub-Contractor)
-
Finished levels within tolerance (Checked by Ventry)
-
Surface finish as per requirements (Checked by Sub-Contractor)
-
Surface finish as per requirements (Checked by Ventry)
-
Saw cut expansion/construction joints (Checked by Sub-Contractor)
-
Saw cut expansion/construction joints (Checked by Ventry)
-
Inspection of workmanship (tests if required) (Checked by Sub-Contractor)
-
Inspection of workmanship (tests if required) (Checked by Ventry)
-
Cover screeds with waterproof sheeting for at least 7 days to prevent drying out by evaporation or wind (Checked by Sub-Contractor)
-
Cover screeds with waterproof sheeting for at least 7 days to prevent drying out by evaporation or wind (Checked by Ventry)
-
Place sheeting as soon as practicable so as not to damage surface (Checked by Sub-Contractor)
-
Place sheeting as soon as practicable so as not to damage surface (Checked by Ventry)
-
Ensure protection is adequate for nature of works to follow (Checked by Sub-Contractor)
-
Ensure protection is adequate for nature of works to follow (Checked by Ventry)
-
Avoid/minimise trafficking or loading of screed for at least 7 days (Checked by Sub-Contractor)
-
Avoid/minimise trafficking or loading of screed for at least 7 days (Checked by Ventry)
-
Surface handover with following trade (Checked by Sub-Contractor)
-
Surface handover with following trade (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: