Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Environmental conditions appropriate to proceed with installation (Checked by Sub-Contractor)

  • Environmental conditions appropriate to proceed with installation (Checked by Ventry)

  • Mix proportions as per manufacturers recommendations (Checked by Sub-Contractor)

  • Mix proportions as per manufacturers recommendations (Checked by Ventry)

  • Test screed mix as specified (Checked by Sub-Contractor)

  • Test screed mix as specified (Checked by Ventry)

  • Any required reinforcement/insulation installed (Checked by Sub-Contractor)

  • Any required reinforcement/insulation installed (Checked by Ventry)

  • Laying the screed: - Installation temperature as per requirements for mix type, - Curing time as per requirements for mix type (Checked by Sub-Contractor)

  • Laying the screed: - Installation temperature as per requirements for mix type, - Curing time as per requirements for mix type (Checked by Ventry)

  • Screeding compacted as specified as works proceed (Checked by Sub-Contractor)

  • Screeding compacted as specified as works proceed (Checked by Ventry)

  • Finished levels within tolerance (Checked by Sub-Contractor)

  • Finished levels within tolerance (Checked by Ventry)

  • Surface finish as per requirements (Checked by Sub-Contractor)

  • Surface finish as per requirements (Checked by Ventry)

  • Saw cut expansion/construction joints (Checked by Sub-Contractor)

  • Saw cut expansion/construction joints (Checked by Ventry)

  • Inspection of workmanship (tests if required) (Checked by Sub-Contractor)

  • Inspection of workmanship (tests if required) (Checked by Ventry)

  • Cover screeds with waterproof sheeting for at least 7 days to prevent drying out by evaporation or wind (Checked by Sub-Contractor)

  • Cover screeds with waterproof sheeting for at least 7 days to prevent drying out by evaporation or wind (Checked by Ventry)

  • Place sheeting as soon as practicable so as not to damage surface (Checked by Sub-Contractor)

  • Place sheeting as soon as practicable so as not to damage surface (Checked by Ventry)

  • Ensure protection is adequate for nature of works to follow (Checked by Sub-Contractor)

  • Ensure protection is adequate for nature of works to follow (Checked by Ventry)

  • Avoid/minimise trafficking or loading of screed for at least 7 days (Checked by Sub-Contractor)

  • Avoid/minimise trafficking or loading of screed for at least 7 days (Checked by Ventry)

  • Surface handover with following trade (Checked by Sub-Contractor)

  • Surface handover with following trade (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.