Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Risk assessment and method statement submitted and agreed (Checked by Sub-Contractor)

  • Risk assessment and method statement submitted and agreed (Checked by Ventry)

  • Cladding proposals incorporate: - a suitable backing for fixing insulation - a breather membrane on cold side of the insulation - fire stops (if specified) - appropriate details around any window and door openings (Checked by Sub-Contractor)

  • Cladding proposals incorporate: - a suitable backing for fixing insulation - a breather membrane on cold side of the insulation - fire stops (if specified) - appropriate details around any window and door openings (Checked by Ventry)

  • Manufacturer's technical literature held on site (Checked by Sub-Contractor)

  • Manufacturer's technical literature held on site (Checked by Ventry)

  • Wind load calculations undertaken by subcontractor to confirm strength of sheeting rails and fixings (Checked by Sub-Contractor)

  • Wind load calculations undertaken by subcontractor to confirm strength of sheeting rails and fixings (Checked by Ventry)

  • Life of coatings consistent with specified life expectancy (Checked by Sub-Contractor)

  • Life of coatings consistent with specified life expectancy (Checked by Ventry)

  • Sheeting rails correctly aligned and all fixings checked (Checked by Sub-Contractor)

  • Sheeting rails correctly aligned and all fixings checked (Checked by Ventry)

  • Liner sheet correctly fixed back (Checked by Sub-Contractor)

  • Liner sheet correctly fixed back (Checked by Ventry)

  • Sealants correctly applied to side laps of liner sheet (Checked by Sub-Contractor)

  • Sealants correctly applied to side laps of liner sheet (Checked by Ventry)

  • Insulation fixed back and close butting (Checked by Sub-Contractor)

  • Insulation fixed back and close butting (Checked by Ventry)

  • Breather membrane correctly installed (Checked by Sub-Contractor)

  • Breather membrane correctly installed (Checked by Ventry)

  • Top sheet: - correct fixings used, side lap sealants correctly applied, side lap fixings at correct centres (Checked by Sub-Contractor)

  • Top sheet: - correct fixings used, side lap sealants correctly applied, side lap fixings at correct centres (Checked by Ventry)

  • Door and window openings correctly formed (Checked by Sub-Contractor)

  • Door and window openings correctly formed (Checked by Ventry)

  • Flashings correctly fixed and longitudinal joints sealed (Checked by Sub-Contractor)

  • Flashings correctly fixed and longitudinal joints sealed (Checked by Ventry)

  • Tested in accordance with specification (Checked by Sub-Contractor)

  • Tested in accordance with specification (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.