Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Risk assessment and method statement submitted and agreed (Checked by Sub-Contractor)
-
Risk assessment and method statement submitted and agreed (Checked by Ventry)
-
Cladding proposals incorporate: - a suitable backing for fixing insulation - a breather membrane on cold side of the insulation - fire stops (if specified) - appropriate details around any window and door openings (Checked by Sub-Contractor)
-
Cladding proposals incorporate: - a suitable backing for fixing insulation - a breather membrane on cold side of the insulation - fire stops (if specified) - appropriate details around any window and door openings (Checked by Ventry)
-
Manufacturer's technical literature held on site (Checked by Sub-Contractor)
-
Manufacturer's technical literature held on site (Checked by Ventry)
-
Wind load calculations undertaken by subcontractor to confirm strength of sheeting rails and fixings (Checked by Sub-Contractor)
-
Wind load calculations undertaken by subcontractor to confirm strength of sheeting rails and fixings (Checked by Ventry)
-
Life of coatings consistent with specified life expectancy (Checked by Sub-Contractor)
-
Life of coatings consistent with specified life expectancy (Checked by Ventry)
-
Sheeting rails correctly aligned and all fixings checked (Checked by Sub-Contractor)
-
Sheeting rails correctly aligned and all fixings checked (Checked by Ventry)
-
Liner sheet correctly fixed back (Checked by Sub-Contractor)
-
Liner sheet correctly fixed back (Checked by Ventry)
-
Sealants correctly applied to side laps of liner sheet (Checked by Sub-Contractor)
-
Sealants correctly applied to side laps of liner sheet (Checked by Ventry)
-
Insulation fixed back and close butting (Checked by Sub-Contractor)
-
Insulation fixed back and close butting (Checked by Ventry)
-
Breather membrane correctly installed (Checked by Sub-Contractor)
-
Breather membrane correctly installed (Checked by Ventry)
-
Top sheet: - correct fixings used, side lap sealants correctly applied, side lap fixings at correct centres (Checked by Sub-Contractor)
-
Top sheet: - correct fixings used, side lap sealants correctly applied, side lap fixings at correct centres (Checked by Ventry)
-
Door and window openings correctly formed (Checked by Sub-Contractor)
-
Door and window openings correctly formed (Checked by Ventry)
-
Flashings correctly fixed and longitudinal joints sealed (Checked by Sub-Contractor)
-
Flashings correctly fixed and longitudinal joints sealed (Checked by Ventry)
-
Tested in accordance with specification (Checked by Sub-Contractor)
-
Tested in accordance with specification (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: