Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Untitled Page
-
Ground investigation carried out and results analysed (Checked by Sub-Contractor)
-
Ground investigation carried out and results analysed (Checked by Ventry)
-
Level survey carried out and agreed (Checked by Sub-Contractor)
-
Level survey carried out and agreed (Checked by Ventry)
-
Setting out markers in position and sound (Checked by Sub-Contractor)
-
Setting out markers in position and sound (Checked by Ventry)
-
Known services (above and below ground) surveyed and marked (Checked by Sub-Contractor)
-
Known services (above and below ground) surveyed and marked (Checked by Ventry)
-
Temporary/permanent fencing secure (Checked by Sub-Contractor)
-
Temporary permanent fencing secure (Checked by Ventry)
-
Disposal of groundwater (Checked by Sub-Contractor)
-
Disposal of groundwater (Checked by Ventry)
-
Agree requirements to maintain excavation stability (Checked by Sub-Contractor)
-
Agree requirements to maintain excavation stability (Checked by Ventry)
-
Accuracy of level of excavation (Checked by Sub-Contractor)
-
Accuracy of level of excavation (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: