Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Untitled Page

  • Sub-base/sub-surface condition (Checked by Sub-Contractor)

  • Sub-base/sub-surface condition (Checked by Ventry)

  • Sub-base/sub-grade levels (Checked by Sub-Contractor)

  • Sub-base/sub-grade levels (Checked by Ventry)

  • Underground services complete (Checked by Sub-Contractor)

  • Underground services complete (Checked by Ventry)

  • Grating line and level (Checked by Sub-Contractor)

  • Grating line and level (Checked by Ventry)

  • Tack coat (Checked by Sub-Contractor)

  • Tack coat (Checked by Ventry)

  • Material type (Checked by Sub-Contractor)

  • Material type (Checked by Ventry)

  • Temperature if required (Checked by Sub-Contractor)

  • Temperature if required (Checked by Ventry)

  • Adequate rolling/compaction (Checked by Sub-Contractor)

  • Adequate rolling/compaction (Checked by Ventry)

  • Specified finish (Checked by Sub-Contractor)

  • Specified finish (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.