Title Page

  • Contract Name and Numbers

  • Description of Works

  • Subcontractor

  • Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)

  • Construction Drawing Ref

  • Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)

  • Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)

Inspection Questions

1st Fix Installation

  • Brackets installed in correct position, line and level (Checked by Sub-Contractor)

  • Brackets installed in correct position, line and level (Checked by Ventry)

  • Weather plate and thermal break installed (Checked by Sub-Contractor)

  • Weather plate and thermal break installed (Checked by Ventry)

  • Correct fixings/bolts installed as specified? (Checked by Sub-Contractor)

  • Correct fixings/bolts installed as specified? (Checked by Ventry)

  • All bolts fully tightened and torqued as specified? (Checked by Sub-Contractor)

  • All bolts fully tightened and torqued as specified? (Checked by Ventry)

  • All coatings as specified and to an acceptable standard? (Checked by Sub-Contractor)

  • All coatings as specified and to an acceptable standard? (Checked by Ventry)

Hold Point Inspection

  • Items above to be checked before work continues with photographic evidence reocrded

2nd Fix Installation

  • Visual inspection of all coatings (Checked by Sub-Contractor)

  • Visual inspection of all coatings (Checked by Ventry)

  • Visual inspection of tension bars and fixings all present and installed (Checked by Sub-Contractor)

  • Visual inspection of tension bars and fixings all present and installed (Checked by Ventry)

  • Spirit level check on all balustrade and fascia panels (Checked by Sub-Contractor)

  • Spirit level check on all balustrade and fascia panels (Checked by Ventry)

  • Spirit level check on decking (Checked by Sub-Contractor)

  • Spirit level check on decking (Checked by Ventry)

  • Visual inspection to main building threshold (Checked by Sub-Contractor)

  • Visual inspection to main building threshold (Checked by Ventry)

  • Visual check on all fixings (Checked by Sub-Contractor)

  • Visual check on all fixings (Checked by Ventry)

  • All fixings torqued as specified (Checked by Sub-Contractor)

  • All fixings torqued as specified (Checked by Ventry)

  • All soffits lined, levelled and screws in square (Checked by Sub-Contractor)

  • All soffits lined, levelled and screws in square (Checked by Ventry)

Comments

  • Any Comments

Final Inspection - All Items Completed and Inspection Passed

  • Inspected By:

  • Inspected By:

  • Inspected By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.