Title Page
-
Contract Name and Numbers
-
Description of Works
-
Subcontractor
-
Area Inspected (Please state building/level/room/zone/elevation/gridlines as per attached drawing)
-
Construction Drawing Ref
-
Other References (Inspection and Test Plan/Specification/Manufacturer's Technical Guide)
-
Supporting Documentation (Photographs/Marked-Up Drawings/Surveys/Test Records)
Inspection Questions
1st Fix Installation
-
Brackets installed in correct position, line and level (Checked by Sub-Contractor)
-
Brackets installed in correct position, line and level (Checked by Ventry)
-
Weather plate and thermal break installed (Checked by Sub-Contractor)
-
Weather plate and thermal break installed (Checked by Ventry)
-
Correct fixings/bolts installed as specified? (Checked by Sub-Contractor)
-
Correct fixings/bolts installed as specified? (Checked by Ventry)
-
All bolts fully tightened and torqued as specified? (Checked by Sub-Contractor)
-
All bolts fully tightened and torqued as specified? (Checked by Ventry)
-
All coatings as specified and to an acceptable standard? (Checked by Sub-Contractor)
-
All coatings as specified and to an acceptable standard? (Checked by Ventry)
Hold Point Inspection
-
Items above to be checked before work continues with photographic evidence reocrded
2nd Fix Installation
-
Visual inspection of all coatings (Checked by Sub-Contractor)
-
Visual inspection of all coatings (Checked by Ventry)
-
Visual inspection of tension bars and fixings all present and installed (Checked by Sub-Contractor)
-
Visual inspection of tension bars and fixings all present and installed (Checked by Ventry)
-
Spirit level check on all balustrade and fascia panels (Checked by Sub-Contractor)
-
Spirit level check on all balustrade and fascia panels (Checked by Ventry)
-
Spirit level check on decking (Checked by Sub-Contractor)
-
Spirit level check on decking (Checked by Ventry)
-
Visual inspection to main building threshold (Checked by Sub-Contractor)
-
Visual inspection to main building threshold (Checked by Ventry)
-
Visual check on all fixings (Checked by Sub-Contractor)
-
Visual check on all fixings (Checked by Ventry)
-
All fixings torqued as specified (Checked by Sub-Contractor)
-
All fixings torqued as specified (Checked by Ventry)
-
All soffits lined, levelled and screws in square (Checked by Sub-Contractor)
-
All soffits lined, levelled and screws in square (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-
Inspected By:
-
Inspected By:
-
Inspected By: