Untitled Page
-
Check proposed Subcontractor is an approved installer for the system proposed (Checked by Sub-Contractor)
-
Check proposed Subcontractor is an approved installer for the system proposed (Checked by Ventry)
-
Check Subcontractor's proposals fully comply with the specifications and the manufacturer's literature (Checked by Sub-Contractor)
-
Check Subcontractor's proposals fully comply with the specifications and the manufacturer's literature (Checked by Ventry)
-
Check risk assessment and method statement have been submitted and are agreed (Checked by Sub-Contractor)
-
Check risk assessment and method statement have been submitted and are agreed (Checked by Ventry)
-
Check any required "specials" have been identified and will be provided by the Subcontractor (Checked by Sub-Contractor)
-
Check any required "specials" have been identified and will be provided by the Subcontractor (Checked by Ventry)
-
Check that no compatibility problems exist at interfaces (Checked by Sub-Contractor)
-
Check that no compatibility problems exist at interfaces (Checked by Ventry)
-
Ensure that there will be no significant following trades trafficking the roof (Checked by Sub-Contractor)
-
Ensure that there will be no significant following trades trafficking the roof (Checked by Ventry)
-
Obtain an on site copy of manufacturer's installation details (Checked by Sub-Contractor)
-
Obtain an on site copy of manufacturer's installation details (Checked by Ventry)
-
Confirm wind calculations and fixing centres approved (Checked by Sub-Contractor)
-
Confirm wind calculations and fixing centres approved (Checked by Ventry)
-
Confirm all details (flashings, upstands, gulleys, walkways etc.) are finished (Checked by Sub-Contractor)
-
Confirm all details (flashings, upstands, gulleys, walkways etc.) are finished (Checked by Ventry)
-
Check access and egress to work face for operatives and materials is safe (Checked by Sub-Contractor)
-
Check access and egress to work face for operatives and materials is safe (Checked by Ventry)
-
Check structure can sustain temporary point loads during installation (Checked by Sub-Contractor)
-
Check structure can sustain temporary point loads during installation (Checked by Ventry)
-
Check roofers are using proper tools and wearing the appropriate footwear (Checked by Sub-Contractor)
-
Check roofers are using proper tools and wearing the appropriate footwear (Checked by Ventry)
-
Check installation is in accordance with the manufacturer's literature (Checked by Sub-Contractor)
-
Check installation is in accordance with the manufacturer's literature (Checked by Ventry)
-
Check all materials are bonded, partially bonded or seperated as per specifications and literature (Checked by Sub-Contractor)
-
Check all materials are bonded, partially bonded or seperated as per specifications and literature (Checked by Ventry)
-
Ensure vapour check is undamaged, sealed at laps and penetrations and is continuous (Checked by Sub-Contractor)
-
Ensure vapour check is undamaged, sealed at laps and penetrations and is continuous (Checked by Ventry)
-
Check insulation is continuous and dry (Checked by Sub-Contractor)
-
Check insulation is continuous and dry (Checked by Ventry)
-
Check all fixings installed are approved and in accordance with details (Checked by Sub-Contractor)
-
Check all fixings installed are approved and in accordance with details (Checked by Ventry)
-
Check width and bonding of all laps on membrane installation (Checked by Sub-Contractor)
-
Check width and bonding of all laps on membrane installation (Checked by Ventry)
-
Check flashings are correctly installed and lapped beneath any associated walling DPC's (Checked by Sub-Contractor)
-
Check flashings are correctly installed and lapped beneath any associated walling DPC's (Checked by Ventry)
-
Check completed membrane is left clean and undamaged (Checked by Sub-Contractor)
-
Check completed membrane is left clean and undamaged (Checked by Ventry)
-
Hose/water test any critical areas e.g: flashings, roof penetrations, valley gutters (Checked by Sub-Contractor)
-
Hose/water test any critical areas e.g: flashings, roof penetrations, valley gutters (Checked by Ventry)
-
Ensure finished installation is protected from foot traffic which may puncture membrane (Checked by Sub-Contractor)
-
Ensure finished installation is protected from foot traffic which may puncture membrane (Checked by Ventry)
-
Ensure manufacturer's warranty is obtained (Checked by Sub-Contractor)
-
Ensure manufacturer's warranty is obtained (Checked by Ventry)
-
Drainage outlets have specified grating (Checked by Sub-Contractor)
-
Drainage outlets have specified grating (Checked by Ventry)
Comments
-
Any Comments
Final Inspection - All Items Completed and Inspection Passed
-