Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has risk assessment been prepared
-
Is area ready for excavations - existing services identified
-
Are levels and excavations accurate
-
Is formation suitable
-
Is necessary shoring in place
-
Has pipe bedding been properly laid
-
Is pipe correct size and properly aligned
-
Are all branches installed
-
Are manholes correctly positioned and formed
-
Have pipe runs been pressure tested
-
Is pipe surround correct
-
Has backfill been correctly compacted
-
Is surface properly reinstated
-
Has surplus excavated material been removed
-
Is area left clean for following trade
-
Are manholes safely covered
-
Have any open drain ends been temporarily sealed