Has a method statement and risk assessment been prepared
-
Is the area prepared for this element / is builders work complete?
-
Has a sample room/area been produced and approved
-
Have electrical works been completed
-
Check fitting of 1st fix joinery, including ceiling noggins
-
Have installed items been protected
-
Ensure good lighting is provided and maintained
-
Check window reveals and position ofDPC
-
Check fitting of windows and margins
-
Check that ceiling joists are level throughout
-
Are angles and stop beads straight and plumb
-
Check openings, soffit reveals and below cill boards for workmanship
-
Check plaster taken down to floor and up to ceiling
-
Check ceiling board joints and wall/ceiling joints
-
Check for straight lines at wall ceiling junctions
-
Is plaster board nailing at correct entries
-
Does the finishing of wall surfaces meet requirements
-
Check all plastered walls for imperfections
-
Has the work area been left clean / are service outlets clear