Title Page

  • Conducted on

  • Prepared by

  • Location
  • Has a method statement and risk assessment been prepared

  • Is the area prepared for this element / is builders work complete?

  • Has a sample room/area been produced and approved

  • Have electrical works been completed

  • Check fitting of 1st fix joinery, including ceiling noggins

  • Have installed items been protected

  • Ensure good lighting is provided and maintained

  • Check window reveals and position ofDPC

  • Check fitting of windows and margins

  • Check that ceiling joists are level throughout

  • Are angles and stop beads straight and plumb

  • Check openings, soffit reveals and below cill boards for workmanship

  • Check plaster taken down to floor and up to ceiling

  • Check ceiling board joints and wall/ceiling joints

  • Check for straight lines at wall ceiling junctions

  • Is plaster board nailing at correct entries

  • Does the finishing of wall surfaces meet requirements

  • Check all plastered walls for imperfections

  • Has the work area been left clean / are service outlets clear

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.