Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has a risk assessment and method statement been prepared
-
Is the area prepared for this element
-
Has a sample room been completed and approved
-
Check that services have been completed above ceiling level
-
Ensure good lighting is provided and maintained
-
Provide radiator positions for additional wall fixing supports. Ditto for any heavy wall fixed items
-
Determine side 1 to all partition walls
-
Check wall alignment and plumb
-
Check centres of fixings to the structure and method of fixing
-
Check vertical stud spacing's
-
Check door opening dimensions, heights and widths
-
Check the partition for stability at various locations
-
Check that all vertical studs face the same direction
-
Check that timber surrounds are solidly fitted to all door openings
-
Check that any cut plaster board is uniformly fitted and edges supported
-
Check that services fitted to side 1 are securely fitted and that they do not foul side 2
-
Check that all electrical back boxes are fixed to plywood pattresses
-
Check sequence and quality of AMES taping to plaster board joints
-
Check the finished surface of sides 1 and 2 for quality of finish
-
Have work areas been left clean and tidy