Location
-
Has a risk assessment and method statement been prepared
-
What means of access is to be used and by whom
-
Is area prepared for this element and all builders work complete
-
Have contact surfaces to the structural steelwork been treated
-
Have samples been received and approved
-
Check setting out positions for roof sheeting and for vertical cladding
-
Have primary fixings and sheeting bolts been fitted to the correct centres
-
Has insulation been fitted
-
Has the vapour control barrier been fitted correctly and without damage. Are joint laps sealed
-
Check that the end laps and edge laps are sealed as work proceeds
-
Check that rain water box section gutters are correctly jointed and internal surfaces are insulated
-
Check fixing of flashings, upstands, cappings and filler pieces
-
Check work quality around all roof lights, vents, upstands and S &V Pipes
-
Have lightning tapes and conductors been correctly installed
-
Check that self adhesive filler sections are fitted to: ridge cappings, eaves and at base of vertical sheeting
-
Check all sheeting for damage
-
Have work areas been left clean and tidy