Title Page

  • Conducted on

  • Prepared by

  • Location
  • Has a risk assessment and method statement been prepared

  • What means of access is to be used and by whom

  • Is area prepared for this element and all builders work complete

  • Have contact surfaces to the structural steelwork been treated

  • Have samples been received and approved

  • Check setting out positions for roof sheeting and for vertical cladding

  • Have primary fixings and sheeting bolts been fitted to the correct centres

  • Has insulation been fitted

  • Has the vapour control barrier been fitted correctly and without damage. Are joint laps sealed

  • Check that the end laps and edge laps are sealed as work proceeds

  • Check that rain water box section gutters are correctly jointed and internal surfaces are insulated

  • Check fixing of flashings, upstands, cappings and filler pieces

  • Check work quality around all roof lights, vents, upstands and S &V Pipes

  • Have lightning tapes and conductors been correctly installed

  • Check that self adhesive filler sections are fitted to: ridge cappings, eaves and at base of vertical sheeting

  • Check all sheeting for damage

  • Have work areas been left clean and tidy

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.