Title Page

  • Conducted on

  • Prepared by

  • Location
  • Has a risk assessment and method statement been prepared

  • Check with your plastering contractor if he intends to use ready mixed mortar for render work

  • check that all builders work is complete

  • Check that protection has been fitted to finished items i..e. windows, doors and frames etc.

  • Provide a sample for approval

  • Check the specification for mix strength requirements and surface finish

  • Check the wall surface to be rendered does offer a good key

  • Agree positions of control joints

  • Check that the contractor has materials available for curing render work

  • Check that the contractor does not intend to use a retarding agent in the mortar mix

  • If render is to be site mixed discuss the requirements of BS 4887 Part 1 with the subcontractor

  • Check backing coat application as work proceeds

  • Check that the areas of wall to be rendered are not saturated with surface water

  • Check that sufficient time is allowed for backing coat to dry

  • Check the method the subcontractor uses to control the thickness of the render

  • Check the period of time allowed between 1st coat and final coat

  • Carry out a final check of all rendered surface prior to the removal of any scaffolding

  • Ensure that the subcontractor removes all temporary protection

  • Check that the work areas are left clean

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.