Has a risk assessment and method statement been prepared
-
Check with your plastering contractor if he intends to use ready mixed mortar for render work
-
check that all builders work is complete
-
Check that protection has been fitted to finished items i..e. windows, doors and frames etc.
-
Provide a sample for approval
-
Check the specification for mix strength requirements and surface finish
-
Check the wall surface to be rendered does offer a good key
-
Agree positions of control joints
-
Check that the contractor has materials available for curing render work
-
Check that the contractor does not intend to use a retarding agent in the mortar mix
-
If render is to be site mixed discuss the requirements of BS 4887 Part 1 with the subcontractor
-
Check backing coat application as work proceeds
-
Check that the areas of wall to be rendered are not saturated with surface water
-
Check that sufficient time is allowed for backing coat to dry
-
Check the method the subcontractor uses to control the thickness of the render
-
Check the period of time allowed between 1st coat and final coat
-
Carry out a final check of all rendered surface prior to the removal of any scaffolding
-
Ensure that the subcontractor removes all temporary protection
-
Check that the work areas are left clean