Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has risk assessment been prepared
-
Is area ready for excavations - existing services identified
-
Are excavations clean and accurate
-
Is the formation suitable (bearing capacity)
-
Is necessary shoring in place
-
Has blinding been properly laid, compacted and clean
-
Is formwork accurate, suitable and adequately propped
-
Check reinforcement and cover
-
Are cast-in items (eg bolts) correctly placed
-
Has concrete been properly placed and levelled
-
Have concrete test cubes been taken and slump tested
-
Is curing treatment and protection in place
-
Has formwork been removed and voids backfilled
-
Is area left clean for following trades
-
Are all potential hazards protected