Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has risk assessment been prepared
-
Is area ready for this element
-
Are timbers preserved and good quality
-
Are fixing methods adequate
-
Check installation of windows and door frames
-
Are grounds properly plumbed and lined
-
Check for thickness and forthcoming plasterwork
-
Check construction of timber framework, partitions
-
Are all joists properly spaced
-
Are service installations catered for
-
Check hangers, struts, etc. for joists and staircases
-
Are areas below joist level clean
-
Has floor boarding been fixed and Weyroc T & G joints glued correctly
-
Have door frames, etc. had knots sealed and been primed prior to fitting
-
Are the fire barriers properly installed
-
Is necessary protection in place
-
Is area clean for following trade
-
Agree handover to Electrical contractor <br>